Defense

December 2, 2013

First P-8A Poseidons report for duty

Patrol Squadron (VP) 16 Commanding Officer Cmdr. Bill Pennington Jr. takes off on a P-8A Poseidon No. 429 aircraft from Naval Air Station Jacksonville, Nov. 29. The take-off represents the squadron’s historic first operational deployment of the Poseidon within the Navy’s maritime patrol and reconnaissance community.

The Navy’s newest, most advanced maritime patrol and reconnaissance aircraft, the P-8A Poseidon, arrived in Kadena Air Base, Okinawa, Japan for its inaugural deployment Dec. 1.

The War Eagles of Patrol Squadron 16 (VP 16) deployed with six P-8As Poseidons in support of 7th Fleet maritime patrol and reconnaissance operations in the Indo-Asia-Pacific region.

The deployment marks a milestone in the transition of U.S. Navy Maritime Patrol and Reconnaissance Forces. For the first time since the Navy received the P-3A Orion in 1962 a new aircraft will be operated by a deployed patrol squadron.

The P-8A Poseidon is the most advanced, long-range anti-submarine and anti-surface warfare aircraft in the world. A true multi-mission aircraft, it also provides superior maritime intelligence, surveillance and reconnaissance capability. The Poseidon is built on the proven Boeing 737 airframe, the most commercially operated aircraft in the world. The transition to the Poseidon brings with it enhanced safety and reduced maintenance.

Based in Jacksonville, Fla., VP-16 began the transition to become the first P-8A squadron 18 months ago, shortly after returning home from a six-month deployment to Kadena Air Base. The War Eagles achieved U.S. Navy safe for flight status in January 2013 and were certified ready for deployment in November 2013.

“I couldn’t be prouder of what the War Eagles have been able to accomplish during the squadron’s transition to the P-8A,” said Commander Bill Pennington, VP-16′s Commanding Officer. “We are well trained and well prepared for this deployment, and excited about the opportunity to demonstrate the Poseidon’s exceptional capabilities.”

The deployment of the P-8A Poseidons to Japan is part of a phased replacement of the propeller driven P-3C Orion now serving in U.S. 7th Fleet operating area. Deploying alongside VP-16 will be the VP-46 Grey Knights from Whidbey Island, Wash., who will operate the venerable Orion.

“In December, we will demonstrate the ability of the Poseidon to operate effectively alongside P-3C during high-tempo deployed operations,” said Capt. Mike Parker, Commander of Task Force 72. “I also look forward to P-8A integrating seamlessly with our international partners and allies. Our interoperability will only get better with Poseidon,’ added Parker.

Patrol Squadron (VP) 16′s P-8A Poseidon No. 429 and No. 435 aircraft refuel at Naval Air Facility Atsugi. The squadron’s landing at NAF Atsugi is part of the Poseidon’s inaugural operational deployment.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>