Tech

January 8, 2014

CITC becomes Drydenís first LEED-certified building

Tags:
Jay Levine
NASA Dryden

The Consolidated Information Technology Center was recently recognized as Drydenís first certified environmentally sustainable building to the Leadership in Energy and Environmental Design silver standard by the U.S. Green Building Council.

NASA’s Dryden Flight Research Center needed a larger and more efficient information technology facility. Now the center has one that also is recognized as an environmentally sustainable building.

The $8.8 million construction project at the center’s Edwards Air Force Base campus doubled the size of the 28-year-old Data Analysis Facility. The result is a more than 44,000-square-foot combined structure referred to as the Consolidated Information Technology Center, or CITC.

The CITC was recently certified to the Leadership in Energy and Environmental Design, or LEED, silver standard. The CITC became Dryden’s first LEED-certified building in October 2013. NASA requires all of its major new buildings to be certified to the LEED silver standard or higher.

The LEED standard allows for certification at the silver, gold, and platinum levels. The designation recognizes the sustainability of the construction as determined by the U.S. Green Building Council’s LEED standard for new construction.

The CITC was occupied in August 2012. Key features that contributed to the silver designation included making Dryden’s flight research mission more sustainable by reducing long-term costs of facility operation, minimizing natural environment impacts and designing work spaces to maximize productivity, said Dryden’s energy manager Dan Mullen.

Included in that sustainability equation is a 20 percent more energy-efficient building compared to standard construction, Mullen explained. The building was also designed to use 50 percent less water for building processes and landscaping compared to a facility using standard design and construction practices.

Banks of cabinets house NASA Dryden’s computer servers in the CITC, Drydenís first certified environmentally sustainable building.

Other elements included the recycling of 89 percent of demolition and construction debris to avoid using landfills and incinerators, he said. In addition, 20 percent of the construction materials were recycled and 75 percent of the project area was landscaped to simulate natural habitat for a total of 22,000 square feet of partially vegetated open space.

†Construction materials such as adhesives, sealants, paints, coatings, carpet and wood products were selected to maintain better indoor air quality and reduce impact to the environment, Mullen said.

The primary driver for the CITC construction project was to provide a more reliable data center, replacing nearly three-decade-old heating, ventilation, air conditioning (HVAC) and electrical infrastructure.

Drydenís new data center also is categorized as a Tier 3 facility, which means that maintenance activities on electrical and HVAC equipment can occur without requiring any shutdown of data center computing. Half of the uninterrupted power supplies and HVAC systems supporting the data center can be shut down completely for maintenance, with the data center continuing to operate at full capacity.

ìThe energy-efficient Tier-3 CITC infrastructure has allowed Dryden to reduce information technology operations and maintenance costs while increasing delivered value to the Dryden community,î said Drydenís Chief Information Officer Larry Freudinger. ìWe have been able to consolidate several smaller data centers into a single new facility that in its first year of operation has demonstrated uptime in excess of 99.9 percent.

The CITC transition, however, is not yet complete. There is ongoing effort to renovate vacated areas of the old data center and enable additional consolidation of personnel and IT equipment.† The reduced and consolidated physical footprint of IT storage, staging and office space is energy efficient and environmentally responsible, Freudinger said.

Southwestern Dakotah, Inc. of Tucson, Ariz., built the CITC. The Development One, Inc.
architectural firm of Santa Ana, Calif. designed the CITC and the new Facility Support Center. T. Simons Construction of Nipomo, Calif. continues work under a $650,000 contract to complete the renovation work in the former Data Analysis Facility half of the building, said Gemma Flores, project manager for the CITC construction and the recently completed Facility Support Center.

The Facility Support Center is an entirely new 38,000 square foot building expected to meet the LEED Platinum standard. Occupancy of that $11.2 million effort is expected in 2014.




All of this week's top headlines to your email every Friday.


 
 

 
NASA photograph by Chris Rink

NASA flies stormy Kansas Skies this summer for science

NASA photograph by Chris Rink Richard Ferrare, a senior research scientist from the Atmospheric Sciences Division at NASA Langley Research Center in Hampton, Va., monitors the data input from the Lidar Atmospheric Sensing Exper...
 
 
NASA photograph by Carla Thomas

DC-8 reaches milestone

NASA photograph by Carla Thomas NASA’s DC-8 makes a low approach to Edwards Air Force Base. NASA’s DC-8 Flying Laboratory recently reached its third decade of delivering groundbreaking science. As a way to celebrate...
 
 
NASA photograph by Tom Tschida

NASA Armstrong leads team to test effects of volcanic ash on aircraft engines

NASA photograph by Tom Tschida Volcanic ash is sprayed into one of the F117 engines of a C-17 during the final phase of the Vehicle Integrated Propulsion Research (VIPR) project July 9 at Edwards. The VIPR team, comprised of NA...
 

 
NASA photograph

NASA, partners test unmanned aircraft systems

NASA photograph NASA’s Ikhana is being used to test a system that will allow uncrewed aircraft to fly routine operations within the National Airspace System. NASA, working with government and industry partners, is testing...
 
 
NASA photograph

NASA-developed air traffic management tool flies into use

NASA photograph NASA Future Flight Central is a national Air Traffic Control/Air Traffic Management (ATC/ATM) simulation facility. The two-story facility offers a 360-degree full-scale, real-time simulation of an airport, where...
 
 
NASA photograph

Robotics teams prepare to compete for $1.5 million in NASA Challenge

NASA photograph The Los Angeles team Survey’s robot is seen as it conducts a demonstration of the level two challenge during the 2014 NASA Centennial Challenges Sample Return Robot Challenge, Thursday, June 12, 2014, at t...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>