Business

January 10, 2014

Navy’s next-gen test equipment achieves Milestone C acquisition approval

From left, Petty Officers Third Class Ira Schwartz and Devin Riley, both aviation electronics technicians, perform diagnostic tests on the Navyís Electronic Consolidated Automated Support System (eCASS) recently at defense contractor Lockheed Martinís Mission Systems and Training site in Orlando, Fla. The eCASS received its Milestone C acquisition approval Dec. 16, paving the way for limited production and installation of the next-generation device used to test avionics for Navy and Marine Corps aircraft.

The Navys Electronic Consolidated Automated Support System recently received Milestone C acquisition approval, paving the way for limited production and installation of the next-generation device used to test aircraft avionics, the service announced Jan. 8.

The Milestone C decision, approved Dec. 16, awards $103 million to defense contractor Lockheed Martin and initiates low-rate initial production of eCASS, with the first stations being used to migrate existing Consolidated Automated Support System test program sets to eCASS, a crucial step toward eventual fleet introduction.

Managed by Naval Air Systems Commands Common Aviation Support Equipment Program Office (PMA-260), Sailors and Marines will use eCASS to troubleshoot and repair aircraft at sea or ashore, allowing them to quickly and efficiently return equipment to readiness status. The new support system will replace the current CASS test equipment the Navys standard automatic test equipment family supporting naval aircraft electronics from the 1990s.

More than two decades old, the legacy CASS are becoming difficult to support and are technologically obsolete, said Dennis Albrecht, principal deputy program manager for PMA-260, which is based at Naval Air Station Patuxent River, Md. Replacement with eCASS is critical to continuing optimal and affordable aircraft readiness. eCASS will become the backbone of avionics repair across the Naval Aviation Enterprise.

With eCASS, the Department of the Navy will enable a cost avoidance of more than $1 billion annually by averting the repair of avionics at the next level of maintenance or sending the parts back to the original equipment manufacturer, said Chris Giggey, PMA-260s deputy program manager for Automatic Test Systems, who manages the eCASS effort.

The next-generation eCASS is technologically advanced and capable of supporting the Navy and Marine Corps current and future aircraft, such as the P-8A and F-35, which are undergoing level-of-repair analysis, Giggey said.

Six hundred and thirteen CASS stations are used by the Department of the Navy and its foreign allies for testing of aircraft electronics, including flight controls, navigation tracking and electronic-warfare support measures.

From midrange tow tractors and mobile hydraulic power supplies to jet-engine test instrumentation, PMA-260 manages the procurement, development and fielding of common, ground-support equipment and automatic test equipment that support every type, model and series of aircraft within the Naval Aviation Enterprise.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 18, 2014

Business: Lockheed to Lose 17 F-35s Under Automatic Pentagon Cuts - Pentagon will cut 17 of the 343 F-35 fighters it planned to buy from Lockheed Martin in fiscal 2016 through 2019 unless Congress repeals automatic budget cuts, according to a new Defense Department report. DOD looking for ways not to break MH-60R helo deal - The...
 
 

News Briefs April 18, 2013

U.S. military deaths in Afghanistan at 2,177 As of April 15, 2014, at least 2,177 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,802 military service members have died in Afghanistan as a result...
 
 
LM-F35-hours

F-35 fleet surpasses 15,000 flying hours

The Lockheed Martin F-35 Lightning II fleet recently surpassed 15,000 flight hours, marking a major milestone for the program.  “Flying 15,000 hours itself demonstrates that the program is maturing, but what I think is e...
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>