Business

January 10, 2014

Navy’s next-gen test equipment achieves Milestone C acquisition approval

From left, Petty Officers Third Class Ira Schwartz and Devin Riley, both aviation electronics technicians, perform diagnostic tests on the Navyís Electronic Consolidated Automated Support System (eCASS) recently at defense contractor Lockheed Martinís Mission Systems and Training site in Orlando, Fla. The eCASS received its Milestone C acquisition approval Dec. 16, paving the way for limited production and installation of the next-generation device used to test avionics for Navy and Marine Corps aircraft.

The Navys Electronic Consolidated Automated Support System recently received Milestone C acquisition approval, paving the way for limited production and installation of the next-generation device used to test aircraft avionics, the service announced Jan. 8.

The Milestone C decision, approved Dec. 16, awards $103 million to defense contractor Lockheed Martin and initiates low-rate initial production of eCASS, with the first stations being used to migrate existing Consolidated Automated Support System test program sets to eCASS, a crucial step toward eventual fleet introduction.

Managed by Naval Air Systems Commands Common Aviation Support Equipment Program Office (PMA-260), Sailors and Marines will use eCASS to troubleshoot and repair aircraft at sea or ashore, allowing them to quickly and efficiently return equipment to readiness status. The new support system will replace the current CASS test equipment the Navys standard automatic test equipment family supporting naval aircraft electronics from the 1990s.

More than two decades old, the legacy CASS are becoming difficult to support and are technologically obsolete, said Dennis Albrecht, principal deputy program manager for PMA-260, which is based at Naval Air Station Patuxent River, Md. Replacement with eCASS is critical to continuing optimal and affordable aircraft readiness. eCASS will become the backbone of avionics repair across the Naval Aviation Enterprise.

With eCASS, the Department of the Navy will enable a cost avoidance of more than $1 billion annually by averting the repair of avionics at the next level of maintenance or sending the parts back to the original equipment manufacturer, said Chris Giggey, PMA-260s deputy program manager for Automatic Test Systems, who manages the eCASS effort.

The next-generation eCASS is technologically advanced and capable of supporting the Navy and Marine Corps current and future aircraft, such as the P-8A and F-35, which are undergoing level-of-repair analysis, Giggey said.

Six hundred and thirteen CASS stations are used by the Department of the Navy and its foreign allies for testing of aircraft electronics, including flight controls, navigation tracking and electronic-warfare support measures.

From midrange tow tractors and mobile hydraulic power supplies to jet-engine test instrumentation, PMA-260 manages the procurement, development and fielding of common, ground-support equipment and automatic test equipment that support every type, model and series of aircraft within the Naval Aviation Enterprise.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>