Space

January 22, 2014

NASA Commercial Crew Partner SpaceX tests Dragon parachute system

nasa-spaceX
Engineers and safety specialists from NASA and Space Exploration Technologies gathered in Morro Bay, Calif., in late December to demonstrate how the company’s Dragon spacecraft’s parachute system would function in the event of an emergency on the launch pad or during ascent.

The test was part of an optional milestone under NASA’s Commercial Crew Integrated Capability (CCiCap) initiative and approved by the agency in August. Through the Commercial Crew Program, SpaceX is one of NASA’s commercial partners working to develop a new generation of U.S. spacecraft and rockets capable of transporting humans to and from low-Earth orbit from American soil. NASA intends to use such commercial systems to fly U.S. astronauts to and from the International Space Station.

The 12,000-pound test craft was lifted 8,000 feet above sea level by an Erickson Sky Crane helicopter and flown over the Pacific Ocean. Following Dragon’s release, two drogue parachutes were released from the top of the spacecraft to slow its decent, before the three main parachutes deployed. The craft splashed down and was quickly recovered by the Sky Crane and carried back to shore.

“The parachute test is essential for the commercial crew effort because it helps us better understand how SpaceX’s system performs as it safely returns crew,” said Jon Cowart, NASA Partner Integration deputy manager working with SpaceX. “Like all of our partners, SpaceX continues to provide innovative solutions based on NASA’s lessons learned that could make spaceflight safer.”

During a normal spacecraft landing, the parachutes will be aided by the Dragonís SuperDraco thrusters to provide a soft controlled landing. This redundancy on both the parachutes and thrusters is designed to ensure safe landings for crews.

“SpaceX is working diligently to make the Dragon spacecraft the safest vehicle ever flown,” said Gwynne Shotwell, president of SpaceX. “The parachute system is an integral part of Dragonís ability to provide a safe landing for nominal and abort conditions — with this successful test we are well-positioned to execute a full end-to-end test of the launch escape system later this year.”

The parachute test puts SpaceX a step closer to launch abort system tests. The company currently is manufacturing the spacecraft and rocket to be used for these flight tests.

SpaceX is on track to complete all 15 of its CCiCap milestones in 2014. All of NASA’s industry partners, including SpaceX, continue to meet their established milestones in developing commercial crew transportation capabilities.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines November 24, 2014

News: Hagel said to be stepping down as defense chief under pressure - Defense Secretary Chuck Hagel is stepping down under pressure, the first cabinet-level casualty of President Obama’s Democratic majority in the Senate and a beleaguered national security team that has struggled to stay ahead of an onslaught of global crises. Afghan mission for U.S....
 
 

News Briefs November 24, 2014

Fog forces five U.S. choppers to land in Polish field Officials say that that fog forced five U.S. Army helicopters to make an emergency landing in a Polish field and spend the night there, the second such incident since September. The U.S. Army said 15 soldiers were moving equipment to their base in Germany Nov....
 
 
Air Force photograph by Samuel King Jr.

Navy’s first F-35C squadron surpasses 1,000 flight hours

Air Force photograph by Samuel King Jr. An F-35C Lightning II aircraft piloted by Lt. Cmdr. Chris Tabert, assigned to Strike Fighter Squadron (VFA) 101, flies the squadron’s first local sortie. The F-35C is the carrier va...
 

 
boeing-SC-787

Boeing South Carolina begins final assembly of its first 787-9 Dreamliner

Boeing has started final assembly of the 787-9 Dreamliner at its South Carolina facility. The team began joining large fuselage sections of the newest 787 Nov. 22 on schedule, a proud milestone for the South Carolina team and a...
 
 
Lockheed Martin image

Ball Aerospace equips Orion mission with key avionics, antenna hardware

Lockheed Martin image Ball Aerospace & Technologies Corp. is providing the phased array antennas and flight test cameras to prime contractor Lockheed Martin for Orion’s Exploration Flight Test-1 (EFT-1), which is an u...
 
 

Salina, Kansas, recalls anniversary of shuttered base

It has been 50 years this month since the announcement that Schilling Air Force Base was closing rattled Salina residents. The Salina Journal, which carried news of the closure in its Nov. 19, 1964, editions, reported that the economic disaster then spared no part of the community – real estate, retail, civic involvement, church attendance,...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>