Business

January 29, 2014

Lockheed Martin receives $31 million U.S. Air Force contract for paveway II Plus laser guided bomb kits

Lockheed Martin has received a $31.1 million contract from the U.S. Air Force for follow-on production of paveway II Plus Laser Guided Bomb kits.

The contract represents the majority share award of the available fiscal year 2013 funding.

Production deliveries under this contract will include computer control groups and air foil groups for GBU-10 and GBU-12 bombs. The paveway II Plus LGB uses an enhanced laser guidance package, significantly improving precision when compared to existing paveway II LGBs.

“Lockheed Martin’s paveway II Plus LGBs deliver superior capability at the best value to the warfighter,” said Joe Serra, precision guided systems manager at Lockheed Martin Missiles and Fire Control. “The contract represents the seventh U.S. Air Force paveway II Plus award and extends production at our Archbald, Pa., facility through the end of 2014.”

The kit consists of a MAU-209C/B computer control group containing the electronic guidance system and an airfoil group to provide lift and stability to the weapons in standard GBU-10 MK-84 (2,000 lb.), GBU-12 MK-82 (500 pound) and GBU-16 MK-83 (1,000 pound) series configurations.

Lockheed Martin is a qualified provider of all three paveway II MK-80 series LGB variants and is the sole provider of the Enhanced Laser Guided Training Round and Dual Mode Laser Guided Bombs.

Designed and manufactured at Lockheed Martin’s 350,000-square-foot production facility in Archbald, the company has delivered more than 130,000 training rounds, more than 70,000 paveway II LGB kits and 7,000 dual mode systems to the U.S. Navy, Marine Corps, Air Force and international customers.

Lockheed Martin Missiles and Fire Control’s Archbald, Penn., facility was selected as one of IndustryWeek magazine’s “Best Plants” for 2013. The program recognizes facilities on the leading edge of manufacturing and operational excellence, with ongoing efforts to increase competitiveness, enhance customer satisfaction, and create stimulating and rewarding work environments.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>