Defense

January 29, 2014

Navyís F-35C completes landing tests ahead of October sea trials

The U.S. Navys carrier-based version of the Lockheed Martin F-35 Lightning II Joint Strike Fighter is nearing October sea trials after completing shore-based testing at Naval Air Engineering Station Lakehurst, New Jersey, to ensure compatibility with shipboard arresting gear.

ìFrom 9 to 16 Jan, the F-35 team accomplished 36 successful roll-in arrestment tests at Lakehurst with the redesigned F-35C arresting hook system on CF-3, wrote Joe DellaVedova, a spokesman for the F-35 Joint Program Office in a Jan. 28 email to USNI News. ìAll flight test objectives were met.

Even before CF-3 deployed to Lakehurst for testing, the F-35Cs redesigned tail-hook showed early signs of promise. ìPrior to the Lakehurst deployment, CF-3 also performed 3 lower-energy roll-ins and 1 fly-in arrestment at Patuxent River [Maryland] to reduce risk by confirming system and instrumentation functional operation, DellaVedova wrote.

Aircraft CF-3, which is the third carrier variant test article, is the first F-35C to be fitted with the redesigned tail-hook. The tail-hook has been a vexing problem on the F-35C variant when it was discovered in 2012 that the original hook could not reliably engage an arresting wire.

Lockheed and the Joint Strike Fighter program office ultimately traced the problem back to the shape of the hook and a faulty wire dynamics model supplied by the Naval Air Systems Command. The solution was to reshape the hook point and adjust the systems hold-down damper, which helps prevent the hook from bouncing around upon touchdown.

With the Lakehurst deployment completed, aircraft CF-3 will spend the next several months proving that it is suitable for operations at sea onboard a carrier.

ìThe aircraft has ferried back to Patuxent River, where it will now commence†3-4 month series of field-based ship suitability tests, including fly-in arrestments that are scheduled to begin soon, DellaVedova said.†ìThese tests are expected to lead to a certification of the F-35C for shipboard flight trials, which are planned to commence in Oct. 2014.

The F-35C was originally expected to conduct sea trials on USS†Nimitz†(CVN-68), however it unclear if that is still the case.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 29, 2015

News: U.S. Army chief opens door to embedding U.S. troops with Iraqi forces - After the fall of Ramadi, the Iraqi Security Forces need military and political leadership, Gen. Raymond Odierno says.   Business: No acquisition strategy yet for LCS frigates - Details of the new Littoral Combat Ship frigate program’s acquisition strategy are still being reviewed,...
 
 

News Briefs May 29, 2015

Finnish navy: Underwater intruder possible foreign submarine Finnish military officials say that an underwater object the navy chased last month in territorial waters and dropped several depth charges could have been a foreign submarine. A navy investigation released May 28 says that technical analysis did not provide sufficient proof of the presence of a submarine...
 
 
Lockheed Martin photograph by Chad Bellay

F-16 test pilots hit the ‘road’ to help train USAFE pilots

Air Force photograph by Airman 1st Class Kyla Gifford Three F-16s assigned to Spangdahlem Air Base, Germany, on a refueling mission last year. Two F-16 test pilots from the 416th Flight Test Squadron recently returned from a &#...
 

 
Navy photograph

Its reign in the fleet over, naval Sea King helicopter now rests at Pax Museum

Navy photograph At more than 54 feet in length with a 62-foot rotor diameter, the mighty SH-3A Sea King helicopter sits in its final spot at the Patuxent River Naval Air Museum. Designed as an anti-submarine warfare helicopter,...
 
 
boeing-korea

New Boeing Avionics Facility to enhance ROKAF readiness, affordability

Boeing formally opened a new avionics maintenance and repair center in the Yeongcheon Industry District of Daegu-Gyeongbuk Free Economic Zone May 28. The 10,000 square-foot facility will test and repair aircraft electrical syst...
 
 
Navy photograph by John F. Williams

ONR testing high-speed planing hulls

Navy photograph by John F. Williams A ship hull model attached to a high-speed sled moves through waves at the David Taylor Model Basin at Naval Surface Warfare Center, Carderock, during Office of Naval Research -sponsored rese...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>