Defense

January 31, 2014

Navy to christen second Mobile Landing Platform

The Navy will christen Mobile Landing Platform John Glenn Feb. 1, during a 10 a.m., PST, ceremony in San Diego, Calif.

Chief of Naval Operations Adm. Jonathan Greenert, will deliver the ceremony’s principal address.   Lyn Glenn, daughter of Sen. John Glenn, will serve as the ship’s sponsor.

The future USNS John Glenn (MLP 2), will honor Sen. Glenn, the legendary astronaut who is the last surviving member of the Mercury 7 crew.  He was the first American to orbit the Earth on Friendship 7 and even flew aboard the Discovery space shuttle at the age of 77.

Upon delivery to the U.S. Navy’s Military Sealift Command (MSC), the John Glenn will be designated as a United States Naval Ship (USNS), and will have a core crew of 34 civilian mariners who will operate and navigate the ship.

Secretary of the Navy Ray Mabus said, “The christening of the future USNS John Glenn (MLP 2), a ship that will help usher in a new age of Navy and Marine Corps operations, is a fitting tribute to a man whose years of service to his nation as a Marine, a U.S. senator and an astronaut helped shape the future of the United States itself.”

In 1942 while a junior in college, Glenn enlisted in the Naval Reserve to become a naval aviation cadet. He then entered active duty to attend the Naval Aviation Pre-Flight School in Iowa and became a naval aviator while he was a Marine.  Glenn flew 59 combat missions as a Marine during World War II, along with 90 combat missions in Korea.  He was also a U.S. senator, serving for 25 years.

The John Glenn is the second ship of the Montford Point-Class. Using the commercially designed Alaska-class crude oil carrier as its base, the Navy’s Strategic and Theater Sealift Program Office worked in conjunction with General Dynamics National Steel and Shipbuilding Company (NASSCO) to develop a design that supports the Navy’s core capabilities while maintaining low costs.

The ship will leverage float-on/float-off technology, allowing the John Glenn to partially submerge, facilitating easy movement of cargo and craft.  Additionally, the ship’s size allows for 25,000 square feet of vehicle and equipment stowage space, tankage for 100,000 gallons of potable water and 380,000 gallons of JP-5 fuel storage.

With this set of capabilities, the ship is able to easily transfer personnel and vehicles from other vessels such as the large, medium-speed, roll-on/roll-off ships (LMSRs) onto landing craft air cushioned (LCAC) vehicles and transport them ashore.

MLP has a maximum speed of 15 knots and range of 9,500 nautical miles.  At 785 feet long, MLPs displace more than 78,000 tons when fully loaded.  The platform with its open, reconfigurable mission deck will serve as an important flexible and transformational asset to the Navy as it can be reconfigured to support a wide variety of future operations.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>