Defense

January 31, 2014

Navy to christen second Mobile Landing Platform

The Navy will christen Mobile Landing Platform John Glenn Feb. 1, during a 10 a.m., PST, ceremony in San Diego, Calif.

Chief of Naval Operations Adm. Jonathan Greenert, will deliver the ceremony’s principal address.   Lyn Glenn, daughter of Sen. John Glenn, will serve as the ship’s sponsor.

The future USNS John Glenn (MLP 2), will honor Sen. Glenn, the legendary astronaut who is the last surviving member of the Mercury 7 crew.  He was the first American to orbit the Earth on Friendship 7 and even flew aboard the Discovery space shuttle at the age of 77.

Upon delivery to the U.S. Navy’s Military Sealift Command (MSC), the John Glenn will be designated as a United States Naval Ship (USNS), and will have a core crew of 34 civilian mariners who will operate and navigate the ship.

Secretary of the Navy Ray Mabus said, “The christening of the future USNS John Glenn (MLP 2), a ship that will help usher in a new age of Navy and Marine Corps operations, is a fitting tribute to a man whose years of service to his nation as a Marine, a U.S. senator and an astronaut helped shape the future of the United States itself.”

In 1942 while a junior in college, Glenn enlisted in the Naval Reserve to become a naval aviation cadet. He then entered active duty to attend the Naval Aviation Pre-Flight School in Iowa and became a naval aviator while he was a Marine.  Glenn flew 59 combat missions as a Marine during World War II, along with 90 combat missions in Korea.  He was also a U.S. senator, serving for 25 years.

The John Glenn is the second ship of the Montford Point-Class. Using the commercially designed Alaska-class crude oil carrier as its base, the Navy’s Strategic and Theater Sealift Program Office worked in conjunction with General Dynamics National Steel and Shipbuilding Company (NASSCO) to develop a design that supports the Navy’s core capabilities while maintaining low costs.

The ship will leverage float-on/float-off technology, allowing the John Glenn to partially submerge, facilitating easy movement of cargo and craft.  Additionally, the ship’s size allows for 25,000 square feet of vehicle and equipment stowage space, tankage for 100,000 gallons of potable water and 380,000 gallons of JP-5 fuel storage.

With this set of capabilities, the ship is able to easily transfer personnel and vehicles from other vessels such as the large, medium-speed, roll-on/roll-off ships (LMSRs) onto landing craft air cushioned (LCAC) vehicles and transport them ashore.

MLP has a maximum speed of 15 knots and range of 9,500 nautical miles.  At 785 feet long, MLPs displace more than 78,000 tons when fully loaded.  The platform with its open, reconfigurable mission deck will serve as an important flexible and transformational asset to the Navy as it can be reconfigured to support a wide variety of future operations.




All of this week's top headlines to your email every Friday.


 
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 
 
af-launch1

9th-generation GPS satellite blasts off from ‘The Cape’

ULA photograph A United Launch Alliance Delta IV rocket launches the GPS IIF-9 satellite for the Air Force March 25, 2015, from Cape Canaveral Air Force Station’s Space Launch Complex-37.   The 45th Space Wing, Cape Cana...
 

 
JSF1

Edwards joint maintenance team completes significant JSF propulsion verification event

Lockheed Martin photograph by Tom Reynolds A joint team of U.S. Air Force and U.S. Navy maintainers, DOD employees and Pratt and Whitney contractors work on an F135 engine March 17 as part of a week-long to provide verified tec...
 
 

F-35 aircraft costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24. Air Force Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts in the latest...
 
 
Army photograph

First unit fields Apache-Shadow combo

Army photograph An RQ-7B Shadow v2 prepares to launch. Manned-unmanned operations using helicopters linked with unmanned aircraft systems, or UAS, have been used by the Army for a number of years. However, no single unit has ev...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>