Defense

February 7, 2014

Local improvement projects culminate in new fuel metering station on Edwards

Members from the 412th Civil Engineering Directorate, 412th Communications Squadron, Kinder Morgan Energy Partners and the Defense Logistics Agency, gather to cut the ceremonial ribbon to officially open up the Kinder Morgan Metering Station Facility Jan. 22. The new system eliminates Edwards AFB’s dependency on three jet fuel break-out storage tanks located at the old George Air Force Base in Victorville, Calif. Beforehand, jet fuel was piped from the San Pedro Port to the George AFB tanks. There, three military fuel additives were injected into the jet fuel and then the fuel was transferred through a filtration system to Edwards AFB via a 57-mile, 6-inch fuel pipeline.

While T-38s took to the Edwards skies, down on the ground a group of contractors, base civil engineers and members of the Defense Logistics Agency officially opened up the new Kinder Morgan Metering Station Facility with a ribbon cutting ceremony Jan. 22.

The 412th Civil Engineering Directorate collaborated with Kinder Morgan Energy Partners who designed and built the new station. According to their company website, KMEP owns or operates more than 82,000 miles of pipelines in the United States and 180 terminals.

The new system eliminates Edwards AFB’s dependency on three jet fuel break-out storage tanks located at the old George Air Force Base in Victorville, Calif. Beforehand, jet fuel was piped from the San Pedro Port to the George AFB tanks. There, three military fuel additives were injected into the jet fuel and then the fuel was transferred through a filtration system to Edwards AFB via a 57-mile, 6-inch fuel pipeline.

“The new station allows Edwards to receive jet fuel directly from Kinder Morgan high pressure pipelines with the injection of the three military additives and filtration taking place on base now instead of in Victorville,” said Cliff Cunningham, 412th Mission Support Group fuels testing and technical adviser.

“Being connected directly to the Kinder Morgan commercial Jet A pipeline and eliminating the intermediate break-out tanks at Victorville means that the commercial Jet A fuel Edwards transitioned to this month is available on demand. Additionally, having the injection and filtration facility within the base perimeter offers increased security for our pipeline delivery system.”

This more efficient way of piping in jet fuel to Edwards came out of necessity. Kinder Morgan’s lease with the City of Victorville expired Feb. 27, 2011.

“KMEP was asked to remove the [George AFB] breakout tanks for potential construction of a commercial warehouse,” said Satwaji Kumar, 412th CE project manager. “Without breakout tanks, Edwards AFB could not receive JP8/Jet A via the pipeline. Due to the City of Victorville not renewing the lease on KMEP’s George Terminal (formerly George AFB Terminal), that terminal will have to be closed.”

Kinder Morgan Energy Partner executives gave a tour of the new metering station Jan. 22 before the formal ribbon cutting ceremony.

To maintain service to Edwards AFB, KMEP installed necessary equipment and modified piping to allow for a stripping operation from the main pipeline in Adelanto, Calif., 56 miles away. In order to serve Edwards AFB directly from the main system’s 8-inch and 14-inch mainlines, modifications were made at the Adelanto Junction to allow Jet A to deliver off the 8-inch mainline at full-line stream, or be stripped from either mainline, and continue on to the Edwards 6-inch line without the need for interim storage at George AFB.

“The City of Victorville has approved extensions to the lease which allowed us time to execute this project and eliminate the need for the three break-out tanks along with the injection & filtration facility,” Cunningham said.

Kumar added that a preconstruction meeting was held last June and the project was completed in a “record breaking time” of seven months.

“All goals and milestones were met. 412th CE initiated the project, pitched and received funding from the Defense Logistics Agency for a communication project. CE coordinated with different agencies for an Environmental Base Study and Easement Lease documents. We created and processed the dig permit, reviewed design, environmental checklists and monitored/coordinated the project on a daily basis,” he said.

KMEP will pump in Defense Logistics Agency bought Jet A, which Edwards recently converted to. Switching from JP-8 to commercial Jet A will save Edwards AFB $2.4 million over the next five years.

Visit www.edwards.af.mil/news/story.asp?id=123357823 for more information on the Air Force’s JP-8 to Jet A fuel conversion.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 28, 2014

News: U.S. has lost track of weapons given to Afghanistan - The United States supplied almost three quarter of a million weapons to Afghanistan’s army and police since 2004, but the military cannot track where many of those arms have gone, a new report found. Bill to improve VA has $17 billion price tag - A bipartisan...
 
 

News Briefs July 28, 2014

Marines seek authorization for dolphin deaths The Marine Corps is asking for a five-year authorization from the National Marine Fisheries Service for incidental deaths of bottlenose dolphins during training exercises at a bombing and target range. The Sun Journal of New Bern, N.C., reports that Connie Barclay of the National Oceanic and Atmospheric Administration says...
 
 
Army photograph by David Vergun

Senior leaders explain Army’s drawdown plan

Army photograph by David Vergun No commander is happy when notified that a soldier from his or her command has been identified for early separation. But commanders personally notify those Soldiers and ensure participation in th...
 

 

Northrop Grumman awarded mission support services contract

The U.S. Army awarded Northrop Grumman a cost-plus-fixed-fee contract, with a potential value of $205 million, to continue providing mission logistics services in support of combat brigades training at the National Training Center in Fort Irwin, Calif. The contract covers one base year and two one-year options. Support will include the full range of mission...
 
 
Lockheed Martin photograph by Beth Groom

F-35 Rollout Marks U.S.-Australia Partnership Milestone

Lockheed Martin photograph by Beth Groom Royal Australian Air Force Air Marshal Geoff Brown delivers his remarks at the roll out ceremony for Australia’s first F-35. The official rollout of the first two F-35 Lightning II...
 
 
NASA/JPL-Caltech image

NASA’s Mars spacecraft maneuvers to prepare for close comet flyby

NASA/JPL-Caltech image This graphic depicts the orbit of comet C/2013 A1 Siding Spring as it swings around the sun in 2014. On Oct. 19, the comet will have a very close pass at Mars. Its nucleus will miss Mars by about 82,000 m...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>