Defense

February 7, 2014

Local improvement projects culminate in new fuel metering station on Edwards

Members from the 412th Civil Engineering Directorate, 412th Communications Squadron, Kinder Morgan Energy Partners and the Defense Logistics Agency, gather to cut the ceremonial ribbon to officially open up the Kinder Morgan Metering Station Facility Jan. 22. The new system eliminates Edwards AFB’s dependency on three jet fuel break-out storage tanks located at the old George Air Force Base in Victorville, Calif. Beforehand, jet fuel was piped from the San Pedro Port to the George AFB tanks. There, three military fuel additives were injected into the jet fuel and then the fuel was transferred through a filtration system to Edwards AFB via a 57-mile, 6-inch fuel pipeline.

While T-38s took to the Edwards skies, down on the ground a group of contractors, base civil engineers and members of the Defense Logistics Agency officially opened up the new Kinder Morgan Metering Station Facility with a ribbon cutting ceremony Jan. 22.

The 412th Civil Engineering Directorate collaborated with Kinder Morgan Energy Partners who designed and built the new station. According to their company website, KMEP owns or operates more than 82,000 miles of pipelines in the United States and 180 terminals.

The new system eliminates Edwards AFB’s dependency on three jet fuel break-out storage tanks located at the old George Air Force Base in Victorville, Calif. Beforehand, jet fuel was piped from the San Pedro Port to the George AFB tanks. There, three military fuel additives were injected into the jet fuel and then the fuel was transferred through a filtration system to Edwards AFB via a 57-mile, 6-inch fuel pipeline.

“The new station allows Edwards to receive jet fuel directly from Kinder Morgan high pressure pipelines with the injection of the three military additives and filtration taking place on base now instead of in Victorville,” said Cliff Cunningham, 412th Mission Support Group fuels testing and technical adviser.

“Being connected directly to the Kinder Morgan commercial Jet A pipeline and eliminating the intermediate break-out tanks at Victorville means that the commercial Jet A fuel Edwards transitioned to this month is available on demand. Additionally, having the injection and filtration facility within the base perimeter offers increased security for our pipeline delivery system.”

This more efficient way of piping in jet fuel to Edwards came out of necessity. Kinder Morgan’s lease with the City of Victorville expired Feb. 27, 2011.

“KMEP was asked to remove the [George AFB] breakout tanks for potential construction of a commercial warehouse,” said Satwaji Kumar, 412th CE project manager. “Without breakout tanks, Edwards AFB could not receive JP8/Jet A via the pipeline. Due to the City of Victorville not renewing the lease on KMEP’s George Terminal (formerly George AFB Terminal), that terminal will have to be closed.”

Kinder Morgan Energy Partner executives gave a tour of the new metering station Jan. 22 before the formal ribbon cutting ceremony.

To maintain service to Edwards AFB, KMEP installed necessary equipment and modified piping to allow for a stripping operation from the main pipeline in Adelanto, Calif., 56 miles away. In order to serve Edwards AFB directly from the main system’s 8-inch and 14-inch mainlines, modifications were made at the Adelanto Junction to allow Jet A to deliver off the 8-inch mainline at full-line stream, or be stripped from either mainline, and continue on to the Edwards 6-inch line without the need for interim storage at George AFB.

“The City of Victorville has approved extensions to the lease which allowed us time to execute this project and eliminate the need for the three break-out tanks along with the injection & filtration facility,” Cunningham said.

Kumar added that a preconstruction meeting was held last June and the project was completed in a “record breaking time” of seven months.

“All goals and milestones were met. 412th CE initiated the project, pitched and received funding from the Defense Logistics Agency for a communication project. CE coordinated with different agencies for an Environmental Base Study and Easement Lease documents. We created and processed the dig permit, reviewed design, environmental checklists and monitored/coordinated the project on a daily basis,” he said.

KMEP will pump in Defense Logistics Agency bought Jet A, which Edwards recently converted to. Switching from JP-8 to commercial Jet A will save Edwards AFB $2.4 million over the next five years.

Visit www.edwards.af.mil/news/story.asp?id=123357823 for more information on the Air Force’s JP-8 to Jet A fuel conversion.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>