Business

February 12, 2014

Sikorsky begins safety of flight tests on first prototype CH-53K Helicopter

sikorksy-flight-test2
Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp., has powered up the engines and spun the rotor head on the first prototype CH-53K heavy lift helicopter – designated the Ground Test Vehicle.

The Jan. 24 event continues the “Bare Head Light Off” phase of testing – so named because it was conducted without rotor blades – that began under auxiliary power in December with safety-of-flight test pilots at the aircraft’s controls.

“GTV main engines powered ‘on’ is a significant step for the CH-53K helicopter program,” said Mike Torok, Sikorsky’s CH-53K Program vice president. “Having independently tested the aircraft’s many components and subsystems, including electrical and avionics, hydraulics and flight controls, landing gear, propulsion, transmissions and rotors, now we have begun testing these critical functions as an entire system powered by the GTV aircraft’s three GE 7,500 shaft horsepower class engines.”

Sikorsky delivered the GTV into the test program at the company’s West Palm Beach, Fla.,-based Development Flight Center in late 2012. Now anchored to the ground at its remote outdoor test site, the 44,000-pound GTV aircraft is outfitted at more than 1,300 points with sensors that will measure and verify the ability to operate safely under its own power. The GTV will undergo ground testing for approximately two years with both Sikorsky and U.S. Marine Corps test pilots at the controls.

Once Bare Head testing is completed, Sikorsky will mount seven main rotor blades and four tail rotor blades onto the GTV. During this second test phase, Sikorsky will conduct extensive aircraft system checks leading to a formal Pre-Flight Acceptance Test required to clear the first flight aircraft for flight testing.

Four additional test aircraft are being prepared for flight test, commencing in late 2014. During the three-year flight test program, Sikorsky will continue to evaluate the GTV for long-term endurance of the engines and dynamic components, survivability, and maintenance practices.

“We have entered a much anticipated phase in this developmental program,” said Col. Robert Pridgen, U.S. Marine Corps Program Manager for Heavy Lift Helicopters. “We have experienced significant learning at the sub-system and component level, which continues to build our confidence in the capabilities of the 53K. We look forward to the initial validation and discovery at a full system level.”

sikorsky-flight-test1

Sikorsky leads an industry team developing the CH-53K heavy lift helicopter for the U.S. Marine Corps. The aircraft’s 88,000-pound maximum gross weight is designed to triple the external load carrying capacity of the CH-53E SUPER STALLION™ aircraft to more than 27,000 pounds over a mission radius of 110 nautical miles under “high hot” ambient conditions.

The U.S. Department of Defense’s Program of Record remains at 200 CH-53K aircraft with a U.S. Marine Corps Initial Operational Capability in 2019. Eventual production quantities would be determined year-by-year over the life of the program based on funding allocations set by Congress and the U.S. Department of Defense acquisition priorities. The Marine Corps intends to stand up eight active duty squadrons, one training squadron, and one reserve squadron to support operational requirements.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>