Business

February 14, 2014

Aerojet Rocketdyne successfully tests large class second stage motor for U.S. Air Force nuclear weapons center

Aerojet Rocketdyne announced Feb. 12 that its Large Class 92″ diameter second stage solid rocket motor was successfully tested at simulated altitude conditions at the Arnold Engineering and Development Complex at Arnold AFB, Tenn.

Aerojet Rocketdyne is aGenCorp company.

The Large Class second stage was designed, fabricated and tested by Aerojet Rocketdyne for the Air Force Nuclear Weapons Center at Hill AFB, Utah, under a demonstration contract which required use of available technologies applicable to multiple future common strategic propulsion systems.

“This stage is a significant improvement over currently fielded systems,” said Tyler Evans, Aerojet Rocketdyne vice president, Rocket Shop(SM) defense advanced programs. “The application of this advanced design, using affordable materials and subsystems provided by our strong industrial base partnerships, will reduce future acquisition program costs and improve system reliability. These technologies are relevant across all Air Force and Navy missiles, whether for strategic deterrence, prompt strike or other applications, and they are key to sustaining the needs of the nation’s war fighters.”

Aerojet Rocketdyne leveraged the contract to sustain and improve the solid rocket motor industrial base, a critical national need recognized by the Office of the Secretary of Defense. The company’s Rocket Shop(SM) staff created a stage design capable of being fielded for 35 years, a significant improvement over currently fielded ground-based systems. Affordability features were integrated into the design, including the use of low-cost propellant common to the solid rocket boosters already in production, and a domestically sourced nozzle exit cone material. The motor case was designed and fabricated at the General Dynamics facility in Lincoln, Neb., using domestically sourced carbon fiber. The thrust vector actuation system was fabricated by Honeywell Aerospace in Tempe, Ariz.

Aerojet Rocketdyne cast the motor and assembled the stage at its facility in Sacramento, Calif., using facilities optimized for affordable production. The test was developed and executed at AEDC in conjunction with the Aerospace Testing Alliance, the test facility’s operating contractor.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 21, 2014

News: IDF releases Iron Dome interception rate - Israel’s Iron Dome system has successfully intercepted 86 percent of the Palestinian rockets that it has engaged during Operation ‘Protective Edge’, according to the Israel Defense Forces.   Business: The turnaround of France’s defense giant Thales - Within seconds of meeting Jean-Bernard Levy it becomes apparent that h...
 
 

News Briefs July 21, 2014

Corruption investigated in Kansas National Guard The Kansas Adjutant General’s office says federal authorities are investigating possible corruption involving outside medical companies’ contracts with the Kansas Army National Guard. Sharon Watson, spokeswoman for the adjutant general’s office, confirmed the investigation Friday to The Lawrence Journal-World but declined to rel...
 
 
Air Force photograph by Rick Goodfriend

B61 undergoes testing in AEDC wind tunnel

Air Force photograph by Rick Goodfriend Arnold Engineering Development Complex engineers recently joined researchers with Sandia National Laboratories to perform a wind tunnel test on a full-scale mock-up B61. Pictured with the...
 

 
Army photograph by Charles Kennedy

New CT scanner finds diverse, important uses for researchers

Army photograph by Charles Kennedy Turning a now-standard tool for medical diagnostics and therapeutics to a host of new applications, the U. S. Army Research Laboratory’s Survivability/Lethality Analysis Directorate rece...
 
 

Ingalls Shipbuilding awarded $23.5 million LHA 8 affordability contract

Huntington Ingalls Industries’ Ingalls Shipbuilding division has been awarded an affordability design contract for $23.5 million for early industry involvement to reduce the construction and life-cycle cost for the amphibious assault ship LHA 8. “Ingalls Shipbuilding has been constructing large-deck amphibious ships for nearly 50 years, and this contract will build on our company...
 
 
Marine Corps photograph

DOD identifies missing World War II Marine

Marine Corps photograph Marines wounded during the landing on Tarawa in November 1943 are towed out on rubber boats to larger vessels that will take them to base hospitals. The Department of Defense POW/Missing Personnel Office...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>