Results of an Air Force Test Center commander directed investigation report on the fire suppression system incident that occurred last month at King Hangar, Eglin Air Force Base, Fla., were released Feb. 18.

The unintended activation of the fire suppression system at approximately noon Jan. 8 resulted in the death of a civilian contractor, while three other Eglin personnel were treated with inhalation injuries.

“This incident is very tragic as we lost a valuable member of our team, and it could have been prevented,” said Maj. Gen. Arnold Bunch, the Air Force Test Center commander. “My reasons for implementing this investigation were to ensure a loss of life or injuries do not happen again. The investigation identifies a number of key areas for improved system performance and personnel training and awareness efforts.”

The primary cause of the inadvertent High Expansion Foam discharge was a valve failure due to freezing water inside the pipes during historically low temperatures between Jan. 6 and Jan. 8. The combination of extended freezing temperatures followed by a rapid thaw resulted in burst pipes and leaks.

A wet-pipe sprinkler system Inspector Test Station broke creating a three inch icicle and slow leak. The wet pipe sprinkler system flow meter initiated the HEF discharge resulting in 17 feet of foam inside King Hangar. Five aircraft assigned to the 53rd Wing and 96th Test Wing were in the hangar when the HEF discharged.

The main reason for the fatality and injuries suffered as a result of the mishap was the loss of situational awareness and decisions made by the contractors to use the building elevator from the third floor to the first floor while the incident was ongoing. The resulting fatality and injuries occurred from the HEF filling up an elevator the victims were in and they were unable to find a way out of the facility.

“While we continue to grieve losing one of our own in this incident, I am confident we have solid technical information to inform our employees how to safely work in environments with fire suppressant systems and respond to any crisis that could occur,” said Bunch.

The CDI made recommendations for implementation throughout AFTC to mitigate the risk of future incidents. Foremost among those the recommendations to minimize the possibility of inadvertent discharge were:

  • Review automatic activation based on wet-pipe flow
  • Improve understanding of the HEF sequence abort function to reduce the number of inadvertent HEF discharges
  • Improve wet-pipe sprinkler systems in HEF equipped hangars to decrease their failure rates
  • Tie HEF activation to wet-pipe flow plus an additional fire indicator such as a heat detection device is also a possibility to consider

The most important of all the recommendations is to improve training of all the fire suppression system operations, according to Bunch.

“What we learned from the CDI will pave the way forward for new safety and training standards across the Air Force Test Center enterprise in how we manage facilities with fire suppressant systems and how we prevent and respond to crisis incidents involving these systems,” said Bunch.

“We will share these findings with other AFMC (Air Force Materiel Command) and Air Force organizations so they can learn as well.”

The Occupational Safety and Health Administration and Air Force Safety Investigation Board are still investigating the incident.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 28, 2015

News: Panel will propose new military retirement system - The long-awaited report on military compensation set to drop Thursday will propose fundamental changes to military retirement and health care benefits, according to several people familiar with the report. Source: DOD to request $585 billion for fiscal 2016 - The Department of Defense is preparing to submit a...
 
 

News Briefs January 28, 2015

Defense contractor to pay $2 million to settle claims A Northern California defense contractor will pay the federal government $2 million to settle claims about its manufacturing of parts for remote-controlled aircraft. The U.S. Attorney’s Office in Sacramento says Sacramento-based Composite Engineering Inc. agreed to pay the money to end allegations that it artificially inflated...
 
 
Navy photograph

USS Roosevelt marks 200,000 trap

Navy photograph An F/A-18F Super Hornet flown by Capt. Daniel Grieco, commanding officer of the aircraft carrier USS Theodore Roosevelt (CVN 71), and Capt. Benjamin Hewlett, deputy commander of Carrier Air Wing (CVW) 1, complet...
 

 
Navy photograph by PO1 William Larned

USS California returns from maiden deployment

Navy photograph by PO1 William Larned The Virginia-class attack submarine USS California (SSN 781) returns from its maiden deployment to its homeport at Naval Submarine Base New London. Under the command of Cmdr. Shawn Huey, Ca...
 
 
Army photograph

Army proves new watercraft capabilities

Army photograph Marine Corps assets are loaded onto the USNS Sgt. Matej Kocak (T-AK 3005), from an U.S. Army Landing Craft Utility, or LCU, USAV Port Hudson during port operations, at White Beach Naval Base, Jan. 22, 2015. Sold...
 
 

Orbital stockholders approve merger with ATK’s aerospace, defense groups

Orbital Sciences Corporation announced Jan. 27 that at a special meeting, the company’s stockholders voted overwhelmingly to approve the proposed merger with the Aerospace and Defense Groups of Alliant Techsystems Inc., pursuant to the definitive transaction agreement dated April 28, 2014. Approximately 99 percent of the votes cast at the special meeting voted in favor...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>