Space

March 10, 2014

Orbital introduces the GEOStar-3 commercial communications satellite platform

Orbital Sciences Corporation, one of the world’s leading space technology companies, March 10 introduced its GEOStar-3TM satellite platform, stating the program is now ready for delivery to commercial satellite operators on production schedules of 24 to 27 months. 

The medium-class GEOStar-3 platform is an extension of Orbital’s highly successful small-class GEOStar-2 bus that has led its market niche for the past decade.

This evolutionary technology upgrade represents an incremental expansion of the company’s flight-proven, low-risk product line, based on a standard platform with configure-to-order payload flexibility to maximize customer value for fixed satellite services, direct to home and high throughput satellite applications.

“The enhanced capacity, flexibility and scalability of the GEOStar-3 platform enables us to address the requirements of the medium-size satellite market, offering customers more payload power, higher throughput and better overall value,” said Christopher Richmond, Orbital’s senior vice president of its Communications Satellite business unit.  “This product expands Orbital’s addressable market, while improving our reliability and delivery schedules to customers around the world, including the high-growth, high-throughput satellite segment.”

The GEOStar-3 platform incorporates key enhancements that evolved from the GEOStar-2 bus, including an upgraded electrical power system that boosts payload power capability from 5 kilowatts up to 8 kilowatts and a physically larger bus allowing the vehicle to support communications payloads weighing up to 800 kilograms.

The company is currently under contract to deliver the first GEOStar-3 in early 2016 and is in active negotiations with several other customers for additional orders, including for its new hybrid electric propulsion platform option.  The hybrid GEOStar-3 design uses traditional chemical propulsion to reach orbit in a matter of days, not months like a full EP satellite, and then performs station-keeping operations for 15 years or more with EP, resulting in an optimum mass-efficient system.

Orbital also designed the GEOStar-3 platform to enable dual-launch configurations.  The ability to stack two GEOStar satellites on a single launch vehicle significantly reduces the overall system cost and provides the widest array of launch options possible, a key benefit of the GEOStar-3 platform to Orbital’s customers.

The GEOStar-3 satellite will continue Orbital’s tradition of industry-leading short-cycle delivery schedules.  The company’s small-class GEOStar-2 spacecraft are regularly delivered in 22 to 24 months and the company expects to deliver the medium-class GEOStar-3 spacecraft in 24 to 27 months.  Like the GEOStar-2 satellite, the GEOStar-3 platform is designed for a service life of at least 15 years.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 6, 2015

News Long wait to come to America for Iraqis, Afghans who served U.S. troops Long wait times and a shortage of available visas for a huge backlog of applications remain major issues for the U.S. government’s Special Immigrant Visa program intended to ease entry to the United States for Iraqis and Afghans who served as...
 
 

News Briefs July 6, 2015

Russian MiG fighter crashes in southern Russia, pilot lives The Russian Defense Ministry says a Russian air force fighter jet has crashed in the south but its pilot ejected safely. The MiG-29 fighter jet went down July 3 near the village of Kushchevskaya in the Krasnodar region, 620 miles south of Moscow. The ministry said...
 
 
Army photograph by Doug LaFon

Army researcher’s interest in robotics leads to innovative device

Army photograph by Doug LaFon Dan Baechle, left, from the U.S. Army Research Laboratory Multifunctional Materials research team, has created a laboratory prototype of a device he designed to sense and damp out arm tremors for A...
 

 
Air Force photograph by TSgt. Joseph Swafford

Pave Hawk maintainers keep rescue birds flying

Air Force photograph by TSgt. Joseph Swafford Airman Joshua Herron, a 41st Expeditionary Helicopter Maintenance Unit HH-60 Pave Hawk crew chief, completes a 50-hour inspection on a Pave Hawk at Bagram Airfield, Afghanistan, Jun...
 
 
Air Force photograph by SrA. Benjamin Raughton

B-52s demonstrate strategic reach

Air Force photograph by SrA. Benjamin Raughton A B-52H Stratofortress is marshalled to a stop at Barksdale Air Force Base, La., after a 44-hour sortie July 2, 2015. Aircrew members and two B-52s from Barksdale AFB’s 96th ...
 
 

Soldier missing from Korean War accounted for

The Department of Defense POW/MIA Accounting Agency announced July 1 that the remains of a serviceman, missing from the Korean War, have been identified and will be returned to his family for burial with full military honors. Army Sgt. Joseph M. Snock Jr. of Apollo, Pennsylvania, was buried July 6, in Arlington National Cemetery. In...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>