Business

March 24, 2014

General Dynamics mission system continues to power Independence-variant Littoral Combat Ship

The U.S Navy christened its newest Independence-variant Littoral Combat Ship, the future USS Jackson (LCS 6), at the Austal shipyard in Mobile, Ala., March 22.

As systems integrator on the Austal USA-led team, General Dynamics Advanced Information Systems is continuing to apply its proven open architecture and open business model approach to the LCS program.

General Dynamics’ open architecture computing infrastructure, OPEN CI, serves as the technology backbone for the ship’s core mission system and provides the Navy with unprecedented flexibility to rapidly and affordably address mission-critical needs.

“Our open architecture computing infrastructure ensures commonality in the ship’s interfaces, allowing for the rapid upgrading and swapping of mission capabilities to enhance performance where and when it’s needed most,” said Carlo Zaffanella, vice president and general manager of Integrated Platform Solutions at General Dynamics Advanced Information Systems. “With OPEN CI, we are helping the Navy drive time and cost out, and innovation and capability in.”

LCS 6, the third Independence-variant ship to be built for the Navy, includes a significant number of core mission system improvements that are the direct result of the lessons learned and the rapid evolution of technology from the LCS 2 and LCS 4 design to the current version. Applying its open architecture approach to the Independence-variant ships, General Dynamics has made it possible to increase system capability, address obsolescence and maintain compatibility with the ship’s many subsystems, while substantially lowering the cost ship-over-ship.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late¬†- Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ‚...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>