Business

March 24, 2014

General Dynamics mission system continues to power Independence-variant Littoral Combat Ship

The U.S Navy christened its newest Independence-variant Littoral Combat Ship, the future USS Jackson (LCS 6), at the Austal shipyard in Mobile, Ala., March 22.

As systems integrator on the Austal USA-led team, General Dynamics Advanced Information Systems is continuing to apply its proven open architecture and open business model approach to the LCS program.

General Dynamics’ open architecture computing infrastructure, OPEN CI, serves as the technology backbone for the ship’s core mission system and provides the Navy with unprecedented flexibility to rapidly and affordably address mission-critical needs.

“Our open architecture computing infrastructure ensures commonality in the ship’s interfaces, allowing for the rapid upgrading and swapping of mission capabilities to enhance performance where and when it’s needed most,” said Carlo Zaffanella, vice president and general manager of Integrated Platform Solutions at General Dynamics Advanced Information Systems. “With OPEN CI, we are helping the Navy drive time and cost out, and innovation and capability in.”

LCS 6, the third Independence-variant ship to be built for the Navy, includes a significant number of core mission system improvements that are the direct result of the lessons learned and the rapid evolution of technology from the LCS 2 and LCS 4 design to the current version. Applying its open architecture approach to the Independence-variant ships, General Dynamics has made it possible to increase system capability, address obsolescence and maintain compatibility with the ship’s many subsystems, while substantially lowering the cost ship-over-ship.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>