Space

April 7, 2014

Intelsat General, L-3 Communication Systems-West test protected Air Force tactical technology on Ku-band

Intelsat General Corp. and L-3 Communication Systems-West (L-3 CS-West) announced the successful demonstration of new U.S. Air Force Protected Tactical Waveform technology over Ku-band transponders on the Intelsat fleet.

The demonstrations and performance characterization were conducted at the Intelsat teleport in Ellenwood, GA, during the week of March 4th. Engineers conducting the tests measured the performance of anti-jam modems and waveform technology from L-3 CS-West on a Ku-band satellite emulator and over the Galaxy 18 satellite, built by SSL and launched in 2008. The tests, observed by a representative from the Air Force Space and Missile Systems Center, demonstrated full-duplex voice, video and IP data via the Air Forceís new Protected Tactical Waveform.

L-3 CS-West is currently working under an Air Force contract, performing studies and developing proof-of-concept modem and security designs using PTW. PTW is designed to provide affordable, anti-jam SATCOM capabilities over existing satellites, leveraging commercial, off-the-shelf technologies.

The testing and transmissions over an existing Intelsat Ku-band satellite validate the compatibility of the PTW with commercial space assets. They also pave the way for future affordable upgrades to provide anti-jam protection to existing Ku-band systems, such as Army, Navy and Air Force remotely piloted aircraft.

Through our collaboration with Intelsat, both airborne and ground users will be able to upgrade using L-3 wideband modems for both higher capacity and protected capabilities, said Val Snyder, President of L-3 ñ Communication Systems West. These results are a big step toward providing our customers the ability to modernize their existing assets to include protected capabilities within the fiscally constrained defense budget environment of today.

L-3 CS-West provided PTW terminal and hub modems to support the end-to-end tests. The modem technology supports processing bandwidths up to 2 GHz and data rates from 10 kbps up to 300 Mbps.

Following the successful demonstration, Intelsat and L-3 CS-West plan to further analyze the potential capabilities of the PTW on Intelsat EpicNG satellites over the next year. The companies expect to conduct additional demonstrations on the Intelsat EpicNG platform in 2015.

The results achieved are an important step toward future upgrades for existing Ku-band users in a constrained budgetary environment, said Mark Daniels, VP of Engineering and Operations at Intelsat General. In addition to anti-jam communications over legacy Ku-band systems, the increased performance, localized beams and wider bandwidths of our new Intelsat EpicNG technology could offer government customers potential protection levels that are extremely attractive.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 20, 2014

News: Navy grounds ‘Top Guns’ - The F/A-18s needs spare parts and in too many cases they’re being taken from brand new jets. This is a risk to national security and pilots’ lives.   Business: Boeing seeks revised schedule for U.S. aerial tanker - Boeing is revising its master schedule for developing the new U.S. Air Force...
 
 

News Briefs October 20, 2014

New military medical team to help with Ebola in U.S. Defense Secretary Chuck Hagel has ordered the military to prepare and train a 30-member medical support team that could provide short-term help to civilian health professionals if there are more Ebola cases in the United States. His spokesman, Rear Adm. John Kirby, says the team...
 
 

Dragon ‘fires up’ for flight

The Air Force and NATO are undergoing a cooperative development effort to upgrade the avionics and cockpit displays of AWACS aircraft belonging to the 552nd Air Control Wing at Tinker Air Force Base, Okla., and the NATO E-3 Sentrys from Geilenkirchen, Germany. The Diminishing Manufacturing Sources Replacement of Avionics for Global Operations and Navigation, otherwise...
 

 
Boeing photographs

Boeing-built X-37B successfully completes third flight

Unmanned spacecraft concludes record-setting 674-day mission   Boeing photograph A third mission of the Boeing-built X-37B Orbital Test Vehicle was completed on Oct. 17, 2014, when it landed and was recovered at Vandenberg...
 
 

Boeing concludes commercial crew space act agreement for CST-100/Atlas V

Boeing has successfully completed the final milestone of its Commercial Crew Integrated Capability Space Act Agreement with NASA. The work and testing completed under the agreement resulted in significant maturation of Boeing’s crew transportation system, including the CST-100 spacecraft and Atlas V rocket. NASA in July approved the Critical Design Review Board milestone for Boeing’...
 
 

AF to release small business research solicitations

The Air Force Small Business Innovation Research and Small Business Technology Transfer program office is set to release its fiscal year 2015 list of topics Oct. 22, on the SBIR/STTR website.  Small businesses and research institutions with expertise to address the topics’ technology challenges are encouraged to submit proposals. During 2014, the Defense Department SBIR...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>