Space

April 7, 2014

Intelsat General, L-3 Communication Systems-West test protected Air Force tactical technology on Ku-band

Intelsat General Corp. and L-3 Communication Systems-West (L-3 CS-West) announced the successful demonstration of new U.S. Air Force Protected Tactical Waveform technology over Ku-band transponders on the Intelsat fleet.

The demonstrations and performance characterization were conducted at the Intelsat teleport in Ellenwood, GA, during the week of March 4th. Engineers conducting the tests measured the performance of anti-jam modems and waveform technology from L-3 CS-West on a Ku-band satellite emulator and over the Galaxy 18 satellite, built by SSL and launched in 2008. The tests, observed by a representative from the Air Force Space and Missile Systems Center, demonstrated full-duplex voice, video and IP data via the Air Forceís new Protected Tactical Waveform.

L-3 CS-West is currently working under an Air Force contract, performing studies and developing proof-of-concept modem and security designs using PTW. PTW is designed to provide affordable, anti-jam SATCOM capabilities over existing satellites, leveraging commercial, off-the-shelf technologies.

The testing and transmissions over an existing Intelsat Ku-band satellite validate the compatibility of the PTW with commercial space assets. They also pave the way for future affordable upgrades to provide anti-jam protection to existing Ku-band systems, such as Army, Navy and Air Force remotely piloted aircraft.

Through our collaboration with Intelsat, both airborne and ground users will be able to upgrade using L-3 wideband modems for both higher capacity and protected capabilities, said Val Snyder, President of L-3 ñ Communication Systems West. These results are a big step toward providing our customers the ability to modernize their existing assets to include protected capabilities within the fiscally constrained defense budget environment of today.

L-3 CS-West provided PTW terminal and hub modems to support the end-to-end tests. The modem technology supports processing bandwidths up to 2 GHz and data rates from 10 kbps up to 300 Mbps.

Following the successful demonstration, Intelsat and L-3 CS-West plan to further analyze the potential capabilities of the PTW on Intelsat EpicNG satellites over the next year. The companies expect to conduct additional demonstrations on the Intelsat EpicNG platform in 2015.

The results achieved are an important step toward future upgrades for existing Ku-band users in a constrained budgetary environment, said Mark Daniels, VP of Engineering and Operations at Intelsat General. In addition to anti-jam communications over legacy Ku-band systems, the increased performance, localized beams and wider bandwidths of our new Intelsat EpicNG technology could offer government customers potential protection levels that are extremely attractive.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>