Business

April 18, 2014

F-35 fleet surpasses 15,000 flying hours

LM-F35-hours
The Lockheed Martin F-35 Lightning II fleet recently surpassed 15,000 flight hours, marking a major milestone for the program. 

“Flying 15,000 hours itself demonstrates that the program is maturing, but what I think is even more impressive is the fact that operational F-35s accounted for more than half of those flight hours,” said J.D. McFarlan, Lockheed Martin’s vice president for F-35 Test & Verification. “While the fleet continues to train, we are actively flight testing the software and mission systems that will enable the Marine Corps to declare Initial Operational Capability next year as planned.”

As of April 7, operational F-35s had flown 8,050 hours while System Development and Demonstration aircraft had accumulated 7,123 flight hours. In 2014, F-35A test aircraft have flown 328 hours; F-35B test aircraft have accumulated 191 hours; and F-35C test aircraft have flown 91 hours. In comparison, operational F-35As have flown 963 hours, while their F-35B and F-35C counterparts have accumulated 1,012 and 98 hours respectively for the year.

“Following successful AIM-120 AMRAAM Weapons Delivery Accuracy (WDA) tests in February and March, we’re looking forward to executing additional WDAs in the 2nd quarter,” said McFarlan. “In another clear sign of program maturation, reliability metrics are trending upward as the operations tempo picks up – recently 60 F-35 sorties were flown in one day.”

The U.S. Marine Corps plans to declare IOC in 2015, while the U.S. Air Force and Navy intend to declare IOC in 2016 and 2018, respectively.

The F-35 Lightning II, a 5th generation fighter, combines advanced low observable stealth technology with fighter speed and agility, fully fused sensor information, network-enabled operations and advanced sustainment. Three distinct variants of the F-35 will replace the A-10 and F-16 for the U.S. Air Force, the F/A-18 for the U.S. Navy, the F/A-18 and AV-8B Harrier for the U.S. Marine Corps, and a variety of fighters for at least 10 other countries.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>