Space

April 18, 2014

NASA signs agreement with SpaceX for use of historic launch pad

NASA Kennedy Space Center’s historic Launch Complex 39A, the site from which numerous Apollo and space shuttle missions began, is beginning a new mission as a commercial launch site.

NASA signed a property agreement with Space Exploration Technologies Corporation (SpaceX) of Hawthorne, Calif., on Monday for use and occupancy of the seaside complex along Florida’s central east coast. It will serve as a platform for SpaceX to support their commercial launch activities.

“It’s exciting that this storied NASA launch pad is opening a new chapter for space exploration and the commercial aerospace industry,” said NASA Administrator Charles Bolden. “While SpaceX will use pad 39A at Kennedy, about a mile away on pad 39B, we’re preparing for our deep space missions to an asteroid and eventually Mars. The parallel pads at Kennedy perfectly exemplify NASA’s parallel path for human spaceflight exploration — U.S. commercial companies providing access to low-Earth orbit and NASA deep space exploration missions at the same time.”

Under a 20-year agreement, SpaceX will operate and maintain the facility at its own expense.

As the worlds fastest growing launch services provider, SpaceX will maximize the use of pad 39A both to the benefit of the commercial launch industry as well as the American taxpayer,î said Gwynne Shotwell, President and COO of SpaceX.†

The reuse of pad 39A is part of NASAs work to transform the Kennedy Space Center into a 21st century launch complex capable of supporting both government and commercial users. At the same time, NASA and Lockheed Martin are assembling the agencys first Orion spacecraft in the Operations and Checkout building while preparing Kennedy’s infrastructure for the Space Launch System rocket, which will lift off from the center’s Launch Complex 39B and send American astronauts into deep space, including to an asteroid and eventually Mars.

“Kennedy Space Center is excited to welcome SpaceX to our growing list of partners,” Center Director Bob Cabana said. “As we continue to reconfigure and repurpose these tremendous facilities, it is gratifying to see our plan for a multi-user spaceport shared by government and commercial partners coming to fruition.”

Launch Complex 39A originally was designed to support NASAs Apollo Program and later modified to support the Space Shuttle Program. Because of the transition from the shuttle program to NASAs Space Launch System and Orion programs, the agency does not have a need for the complex to support future missions.

Pad 39A was first used to launch Apollo 4 on Nov. 9, 1967; it is the site where Apollo 11 lifted off from on the first manned moon landing in 1969; and the pad was last used for space shuttle Atlantis’ launch to the International Space Station on July 11, 2011 for the STS-135 mission, the final shuttle flight. This agreement with SpaceX ensures the pad will be used for the purpose it was built – launching spacecraft.




All of this week's top headlines to your email every Friday.


 
 

 

NASA partners punctuate summer with spacecraft development advances

Spacecraft and rocket development is on pace this summer for NASA’s aerospace industry partners for the agency’s Commercial Crew Program as they progress through systems testing, review boards and quarterly sessions under their† Space Act Agreements with the agency. NASA engineers and specialists continue their review of the progress as the agency and partners move...
 
 

NASA seeks proposals for commercial Mars data relay satellites

NASA has issued a Request for Information to investigate the possibility of using commercial Mars-orbiting satellites to provide telecommunications capabilities for future robotic missions to the Red Planet. We are looking to broaden participation in the exploration of Mars to include new models for government and commercial partnerships, said John Grunsfeld, associate administrator of NASAR...
 
 
NASA photograph

NASA’s Chandra X-ray Observatory celebrates 15th anniversary

NASA photograph To celebrate the 15th anniversary of NASA’s Chandra X-ray Observatory, four new images of supernova remnants are being released. These spectacular cosmic vistas are the glowing debris fields that were crea...
 

 
NASA photograph

NASA begins engine test project for space launch system rocket

NASA photograph RS-25 rocket engine No. 0525 is positioned onto the A-1 Test Stand at NASAís Stennis Space Center in Mississippi preparation for a series of developmental tests. Engineers have taken a crucial step in preparing...
 
 

SSL selected to study asteroid retrieval for NASA

Space Systems/Loral, a leading provider of commercial satellites, announced July 18 that it was one of the companies selected by NASA to study system concepts and key technologies for NASA’s Asteroid Redirect Mission, which is expected to be a key part of the agency’s path to sending humans to Mars. SSL will conduct two studies;...
 
 
NASA image

NASA turns over next-gen air traffic management tool to FAA

NASA image As seen in this image, Terminal Sequencing and Spacing technology enables air traffic controllers to better manage the spacing between aircraft as they save both time and fuel and reducing emissions, flying more effi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>