Business

April 18, 2014

Sikorsky tests CH-53K helicopter for airframe structural strength

sikorsky-test
Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp., has successfully completed an initial series of tests required by the Naval Air Systems Command to verify the structural strength of the CH-53K heavy lift helicopter.

Conducted on a full-size non-flying airframe called the Static Test Article, the tests are part of a three-year program to validate that the largest helicopter ever designed and built by Sikorsky has the structural integrity to operate safely over its entire flight envelope — from its empty gross weight of 44,000 pounds up to its maximum gross weight of 88,000 pounds with external load.

“The Static Test Article will enable Sikorsky to replicate the many stresses, strains and aerodynamic forces the CH-53K helicopter will experience during all aspects of flight, whether the aircraft is empty, filled with cargo, or carrying up to 36,000 pounds of gear suspended beneath the aircraft by an external sling,” said Mike Torok Sikorsky’s CH-53K Program Vice President. “By placing incrementally heavier static loads on various parts of the airframe assembly — including those well beyond the airframe’s analytical design strength — we can measure structural integrity, airworthiness and crash worthiness, and verify safety margins for all expected operational conditions.”

The Static Test Article is housed in a specially-built test facility at Sikorsky’s manufacturing plant in Stratford, Conn. Consisting of the cockpit, the cabin, fuel sponsons, a transition section and the tail rotor pylon, the complete airframe assembly is suspended off the ground by the shaft of its main rotor gearbox. Surrounding support beams hold the numerous hydraulic cylinders that apply the flight and inertial loads to parts of the airframe assembly. Also attached to the STA structure are component-representative weights that simulate the presence of the engines and landing gear, among other key subsystems and components.

To date, Sikorsky has completed a total of six test conditions on the Static Test Article, all conducted during 2013 and early 2014. The first four test conditions satisfy pre-flight requirements ahead of a CH-53K flight test aircraft taking to the skies for the first time later this year. Replicating the maximum load conditions encountered while in flight, the four pre-flight tests measured the structural strength of the tail rotor pylon during high and low speed flight maneuvers, the landing gear during impact with the ground, and the full airframe structure while under maximum rotor power.

Sikorsky will continue to test the structural integrity of the CH-53K Static Test Article for another two years to validate the effects of aerodynamic forces and weight distribution on different sections of the airframe.

The Static Test Article is the first of two non-flying CH-53K test articles — along with five prototype and four production-representative heavy lift helicopters — that Sikorsky is developing as part of a $3.8 billion System Development and Demonstration contract for the U.S. Navy.

Per the current program of record, the Marine intends to order 200 CH-53K production aircraft, and to stand up eight operational squadrons and one training squadron to support the Marine Corps’ operational requirements. Eventual production quantities would be determined year-by-year over the life of the program based on funding allocations set by Congress and the U.S. Department of Defense acquisition priorities.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 29, 2015

News: U.S. Army chief opens door to embedding U.S. troops with Iraqi forces - After the fall of Ramadi, the Iraqi Security Forces need military and political leadership, Gen. Raymond Odierno says.   Business: No acquisition strategy yet for LCS frigates - Details of the new Littoral Combat Ship frigate program’s acquisition strategy are still being reviewed,...
 
 

News Briefs May 29, 2015

Finnish navy: Underwater intruder possible foreign submarine Finnish military officials say that an underwater object the navy chased last month in territorial waters and dropped several depth charges could have been a foreign submarine. A navy investigation released May 28 says that technical analysis did not provide sufficient proof of the presence of a submarine...
 
 
Lockheed Martin photograph by Chad Bellay

F-16 test pilots hit the ‘road’ to help train USAFE pilots

Air Force photograph by Airman 1st Class Kyla Gifford Three F-16s assigned to Spangdahlem Air Base, Germany, on a refueling mission last year. Two F-16 test pilots from the 416th Flight Test Squadron recently returned from a &#...
 

 
Navy photograph

Its reign in the fleet over, naval Sea King helicopter now rests at Pax Museum

Navy photograph At more than 54 feet in length with a 62-foot rotor diameter, the mighty SH-3A Sea King helicopter sits in its final spot at the Patuxent River Naval Air Museum. Designed as an anti-submarine warfare helicopter,...
 
 
boeing-korea

New Boeing Avionics Facility to enhance ROKAF readiness, affordability

Boeing formally opened a new avionics maintenance and repair center in the Yeongcheon Industry District of Daegu-Gyeongbuk Free Economic Zone May 28. The 10,000 square-foot facility will test and repair aircraft electrical syst...
 
 
Navy photograph by John F. Williams

ONR testing high-speed planing hulls

Navy photograph by John F. Williams A ship hull model attached to a high-speed sled moves through waves at the David Taylor Model Basin at Naval Surface Warfare Center, Carderock, during Office of Naval Research -sponsored rese...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>