Business

June 11, 2014

Northrop Grumman, U.S. Navy conduct successful simultaneous manned, unmanned helicopter flight tests

An MQ-8B Fire Scout unmanned helicopter prepares to land on the littoral combat ship USS Freedom (LCS 1) off the coast of Southern California. The training marked the first time a littoral combat ship, an MQ-8B Fire Scout unmanned helicopter and an SH-60R Sea Hawk helicopter conducted integrated training.

 
Northrop Grumman and the U.S. Navy successfully flew the unmanned MQ-8B Fire Scout simultaneously with the MH-60R Sea Hawk helicopter for the first time.

The capability demonstrates how a mix of aircraft can increase a ship commander’s intelligence-gathering capabilities aboard the Littoral Combat Ship.

The flight tests took place May 12, aboard the USS Freedom (LCS 1) off the coast of San Diego. Fire Scout complements the Sea Hawk because it can fly longer to maintain constant surveillance on a target or area of interest.

“Utilizing the Fire Scout in operational maritime scenarios with manned aircraft will prove to be a unique asset to our fleet,” said Capt. Patrick Smith, Fire Scout program manager. “The sensors of the Fire Scout are providing complimentary situational awareness and precision targeting support for the MH-60R Sea Hawk and Littoral Combat Ships.”

The MQ-8B Fire Scout is designed to takeoff autonomously and land from any aviation-capable warship. It has the endurance to fly for five hours and has logged more than 12,500 flight hours from land and sea.

“Fire Scout is giving our war fighters enhanced persistent situational awareness,” said George Vardoulakis, vice president, medium range tactical systems, Northrop Grumman Aerospace Systems. “Fire Scout systems are providing critical information to the pilots of the MH-60R Sea Hawk and the sailors of the Littoral Combat Ship to ensure that they are protected from maritime threats.”

The MQ-8B Fire Scout is on its eighth at-sea deployment supporting a variety of surveillance and security missions onboard Navy frigates. The system also completed a two-year mission providing ground commanders intelligence-gathering capabilities in Afghanistan.

Click here to watch on YouTube.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>