Defense

June 25, 2014

New aircraft carrier recovery technology moves one step closer to fleet integration

Sailors use a new Compact Swaging Machine (CSM) for the first time to attach an arresting gear wire terminal on the flight deck of the aircraft carrier USS Ronald Reagan (CVN 76). The first operational fleet test of the highly anticipated CSM was successfully completed May 12, when the machine was used to install new terminals on purchase cable arresting wires. The CSM is designed to reduce workload and dramatically increase the quality of life for flight deck sailors.

The new Compact Swaging Machine, responsible for automating a current hazardous process and reducing Sailor workload, successfully completed its first operational fleet test aboard the USS Ronald Reagan (CVN 76) May 12.

The CSM uses hydraulic pressure to mold, or swage, a terminal onto an aircraft carrier purchase cable. This terminal connects to a cross-deck pendant that stretches across the flight deck, which engages the tail hook of a landing aircraft allowing for a smooth, controlled arrestment.

“The CSM automates a process that has been practiced by the fleet since the Navy started using aircraft carrier arresting gear,” said Jim Raevis, CSM team lead.

On the morning of May 9, the prototype CSM that had been placed in an ISO freight container was craned aboard the CVN 76 flight deck. On May 12, four new terminals were successfully swaged onto purchase cables, and within hours of CVN 76 leaving port in San Diego, California, the cables began taking arrestments from manned aircraft.

“Endorsed as the number one priority by the ALRE (Aircraft Launch and Recovery Equipment) community at the last three meetings of the Aviation Boatswain’s Mates Association, the CSM will dramatically increase the quality of life for the Sailor,” said Andrew Sussman, recovery integrated product team lead for the U.S. Navy’s ALRE Program Office (PMA-251).

After each newly-swaged wire has accrued 500 arrestments, or aircraft landings, estimated to happen by late this summer, the cables will then be cropped and shipped to Joint Base McGuire-Dix-Lakehurst in Lakehurst, N.J., where personnel will conduct residual life testing.

“We are going to test the terminals and wires to their point of destruction to discover how much strength remains,” Raevis said. “That’s the type of testing we have conducted every step of this program.”

The current time-intensive process of replacing a terminal requires four to six Sailors and can take up to 12 hours to complete. During this process, zinc is heated to 1,000-degrees Fahrenheit in a small space onboard the ship, and the molten metal is then poured into a socket. Special care is required during this risky process, and the work must be repeated if strict material tolerances are not met.

PMA-251 and industry partner, Creare Engineering Research & Development, while under NAVAIR Small Business Innovation Research contract, designed the advanced hydraulic system.

“The CSM requires only one Sailor and forms the replacement terminal in an hour,” said Cmdr. Tony Hernandez, ALRE fleet liaison officer. “Needless to say, the machine’s capability will leave a lasting impression in naval history.”

“The plan forward is to remove socket pouring across the fleet in total, replacing it with CSMs in each and every ship,” Raevis said, adding that fleet installations are currently planned to begin in 2018.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 27, 2015

News: U.S. Air Force certifies SpaceX for military launches - SpaceX has been certified for military space launch, the U.S. Air Force announced May 26. The long-awaited announcement is a game changer, with SpaceX becoming only the second provider cleared by the service to launch national security payloads into orbit.   Business: Northrop Grumman CEO issues...
 
 

New’s Briefs May 27, 2015

U.S. military begins search flights for stranded Rohingya The United States has begun military surveillance flights to help locate stranded Rohingya and Bangladeshi boat people in Southeast Asian seas. State Department spokesman Jeff Rathke said May 26 that U.S. Navy P8 aircraft flew over the weekend with Malaysian support. Rathke said the U.S. has offered...
 
 
nasa-commercial-crew

Commercial Crew milestones met; partners on track for 2017 missions

NASA has taken another step toward returning America’s ability to launch crew missions to the International Space Station from the United States in 2017. The Commercial Crew Program ordered its first crew rotation mission fro...
 

 
af-spacex

Air Force certifies SpaceX for national security space missions

Lt. Gen. Samuel Greaves, commander of the Air Force Space and Missile Systems Center and Air Force program executive officer for space, has announced the certification of Space Exploration Technologies Corporation’s Falco...
 
 

Northrop Grumman passes key design review for B-2 weapons management upgrade

Northrop Grumman has successfully demonstrated to the U.S. Air Force that its plans to upgrade key weapons management software for the B-2 stealth bomber are on track and ready to proceed to the next level of development. The company successfully completed the critical design review of the service’s Flexible Strike Phase 1 program on Feb...
 
 
boeing-space

Boeing awarded first-ever commercial human spaceflight mission

NASA issued a task order as part of Boeing’s $4.2 billion Commercial Crew Transportation Capability contract recently to include the company’s first-ever service flight to the International Space Station. The award ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>