Space

July 18, 2014

NASA begins engine test project for space launch system rocket

RS-25 rocket engine No. 0525 is positioned onto the A-1 Test Stand at NASAís Stennis Space Center in Mississippi preparation for a series of developmental tests.

Engineers have taken a crucial step in preparing to test parts of NASA’s Space Launch System rocket that will send humans to new destinations in the solar system.

They installed July 17 an RS-25 engine on the A-1 Test Stand at the agency’s Stennis Space Center near Bay St. Louis, Miss.

The Stennis team will perform developmental and flight certification testing of the RS-25 engine, a modified version of the space shuttle main engine that powered missions into space from 1981 to 2011.† The SLS’s core stage will be powered by a configuration of four RS-25 engines, like the one recently installed on the A-1 stand.

“This test series is a major milestone because it will be our first opportunity to operate the engine with a new controller and to test propellant inlet conditions for SLS that are different than the space shuttle,” said Steve Wofford, SLS Liquid Engines Element manager. “This testing will confirm the RS-25 will be successful at powering SLS.”

Early tests on the engine will collect data on the performance of its new advanced engine controller and other modifications. The controller regulates valves that direct the flow of propellant to the engine, which determines the amount of thrust generated during an engine test, known as a hotfire test. In flight, propellant flow and engine thrust determine the speed and trajectory of a spacecraft. The controller also regulates the engine startup sequence, which is especially important on an engine as sophisticated as the RS-25. Likewise, the controller determines the engine shutdown sequence, ensuring it will proceed properly under both normal and emergency conditions.

“Installation of RS-25 engine No. 0525 signals the launch of another major rocket engine test project for human space exploration on the A-1 Test Stand,” said Gary Benton, RS-25 rocket engine test project manager at Stennis.

The SLS is designed to carry astronauts in NASA’s Orion spacecraft deeper into space than ever before, to destinations including an asteroid and Mars. NASA is using existing and in-development hardware and infrastructure, including the RS-25 engine, to the maximum extent possible to enable NASA to begin deep space missions sooner.

Testing of engine No. 0525 begins in the coming weeks on a test stand originally built in the 1960s for Apollo-era engines that helped launch the lunar missions. The stand has since been used for several major testing projects, and NASA spent almost a year modifying the structure to accommodate the RS-25 engine.

The SLS Program is managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. Aerojet Rocketdyne of Sacramento, Calif., is on contract with NASA to adapt the RS-25 engines for SLS missions.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 17, 2015

News: Army extends benefits to Hood shooting victims - The Army will provide “all possible benefits” to victims of the 2009 Fort Hood shooting who recently were awarded the Purple Heart, the service announced April 16.   Business: Rolls-Royce lands biggest deal in its 109-year history - U.K. engineering company Rolls-Royce has won the largest order in...
 
 

News Briefs April 17, 2015

Army orders financial benefits for 2009 Fort Hood victims Dozens of soldiers and surviving family members of the 2009 Fort Hood, Texas, shooting are receiving additional Army pay that they felt was long overdue. The announcement from Army Sec. John McHugh April 16 comes a week after 36 Purple Hearts were awarded to victims and...
 
 
NASA illustration

NASA awards radiation challenge winners, launches next round

NASA illustration This illustration depicts our heliosphere, showing the approximate locations of Voyager 1 and Voyager 2 spacecraft. Galactic cosmic rays originate outside the heliosphere and stream in uniformly from all direc...
 

 

U.S. Air Force completes operational testing on Raytheon’s MALD-J

Raytheon and the U.S. Air Force successfully completed operational tests of Miniature Air Launched Decoy-Jammer, satisfying all requirements to attain Initial Operational Capability. “MALD-J’s unique capabilities have been proven in 42 successful flight tests during the last two years and brought us closer to full rate production,” said Mike Jarrett, vice president of Raytheon...
 
 

Northrop Grumman to expand North Dakota presence

In partnership with local leadership, Northrop Grumman confirmed its dedication to the future of unmanned systems development in the Red River Valley region by signing a lease agreement to anchor the new Grand Sky Technology Park in Grand Forks County. Northrop Grumman is working to identify specialized opportunities for the Grand Sky facility. The opportunities,...
 
 

Raytheon awarded more than $2 billion for an International Patriot system

Raytheon announced April 17 it has been awarded a contract worth over $2.0 billion to deliver the combat-proven Patriot Air and Missile Defense System to an undisclosed international customer. The contract, awarded April 2, 2015, and booked in the second quarter as a direct commercial sale, includes fully digitized new-production Patriot fire units with the...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>