Space

July 18, 2014

NASA begins engine test project for space launch system rocket

RS-25 rocket engine No. 0525 is positioned onto the A-1 Test Stand at NASAís Stennis Space Center in Mississippi preparation for a series of developmental tests.

Engineers have taken a crucial step in preparing to test parts of NASA’s Space Launch System rocket that will send humans to new destinations in the solar system.

They installed July 17 an RS-25 engine on the A-1 Test Stand at the agency’s Stennis Space Center near Bay St. Louis, Miss.

The Stennis team will perform developmental and flight certification testing of the RS-25 engine, a modified version of the space shuttle main engine that powered missions into space from 1981 to 2011.† The SLS’s core stage will be powered by a configuration of four RS-25 engines, like the one recently installed on the A-1 stand.

“This test series is a major milestone because it will be our first opportunity to operate the engine with a new controller and to test propellant inlet conditions for SLS that are different than the space shuttle,” said Steve Wofford, SLS Liquid Engines Element manager. “This testing will confirm the RS-25 will be successful at powering SLS.”

Early tests on the engine will collect data on the performance of its new advanced engine controller and other modifications. The controller regulates valves that direct the flow of propellant to the engine, which determines the amount of thrust generated during an engine test, known as a hotfire test. In flight, propellant flow and engine thrust determine the speed and trajectory of a spacecraft. The controller also regulates the engine startup sequence, which is especially important on an engine as sophisticated as the RS-25. Likewise, the controller determines the engine shutdown sequence, ensuring it will proceed properly under both normal and emergency conditions.

“Installation of RS-25 engine No. 0525 signals the launch of another major rocket engine test project for human space exploration on the A-1 Test Stand,” said Gary Benton, RS-25 rocket engine test project manager at Stennis.

The SLS is designed to carry astronauts in NASA’s Orion spacecraft deeper into space than ever before, to destinations including an asteroid and Mars. NASA is using existing and in-development hardware and infrastructure, including the RS-25 engine, to the maximum extent possible to enable NASA to begin deep space missions sooner.

Testing of engine No. 0525 begins in the coming weeks on a test stand originally built in the 1960s for Apollo-era engines that helped launch the lunar missions. The stand has since been used for several major testing projects, and NASA spent almost a year modifying the structure to accommodate the RS-25 engine.

The SLS Program is managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. Aerojet Rocketdyne of Sacramento, Calif., is on contract with NASA to adapt the RS-25 engines for SLS missions.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 6, 2015

News: IG: VHA misappropriated $92.5M for claims system - The Veterans Health Administration (VHA) misappropriated more than $90 million intended for medical support and compliance programs in order to build an automated claims processing system, according to an Inspector General report released this week.   Business: Gulf arms race fuels UAE push for defense industry - Soaring...
 
 

News Briefs March 6, 2015

Man charged with theft of military documents seeks release An engineer who worked for a defense contractor who’s been charged with attempting to travel to China with stolen documents on the development of advanced titanium for U.S. military aircraft is asking a judge to free him while he awaits trial. A hearing on Yu Long’s...
 
 
Air Force photograph by Rick Goodfriend

AFRL offering prize for turbine engine development

Air Force photograph by Rick Goodfriend Discover meetings to be held in Ohio on March 24-25. The Air Force Research Laboratory is leading the first Air Force technology prize, issuing a challenge to develop a small, efficient t...
 

 
Lockheed Martin photograph

Lockheed Martin P-3 Orion wing line restarted

Lockheed Martin photograph From left: Peter Hillier, Karen Eilbmeier, and Michael Spurr from the Canada Department of National Defence were on hand to commemorate the reopening of the P-3 wing line at Marietta, Ga.   Lockh...
 
 
Army photograph

Army Research Laboratory lays out science and technology priorities through 2019

Army photograph Dr. Rick Beyer, propulsion science expert, aligns a sample in a Bruker Wide-angle X-ray scattering camera at the Army Research Laboratory in Adelphi, Md. The laboratory recently released its technical implementa...
 
 
Air Force photograph by A1C Dillian Bamman

‘Iron Horse’ sets off for final flight

Air Force photograph by A1C Dillian Bamman Aircraft 62-1863 ‘Iron Horse’, a HC-130P Combat King, rests before takeoff Mar. 3, 2015, at Moody Air Force Base, Ga. Throughout its career, Iron Horse has flown for over 27,000 ho...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>