Business

July 30, 2014

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C.

Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final assembly of the first 787-10 scheduled to begin in South Carolina in 2017.

“We looked at all our options and found the most efficient and effective solution is to build the 787-10 at Boeing South Carolina,” said Larry Loftis, vice president and general manager, 787 program, Boeing Commercial Airplanes. “This will allow us to balance 787 production across the North Charleston and Everett sites as we increase production rates. We’re happy with our growth and success in South Carolina, and the continued success at both sites gives us confidence in our plan going forward.”

The 787-10 will be 18 feet (5.5 meters) longer than the 787-9. With 10 feet (3 meters) of that increase in the midbody section, the 787-10 midbody is too long to be transported efficiently from North Charleston, where systems integration work is performed, to the Everett facility for final assembly. In addition, introducing the 787-10 in North Charleston takes advantage of that facility’s capacity while allowing the Everett facility to continue improving productivity as it focuses on the 787-8 and 787-9.

The 787 production system includes three production lines: two in Everett (including a temporary surge line) and one in South Carolina. The integrated production system currently operates at a production rate of 10 airplanes per month. As announced last year, the 787 production rate will increase to 12 airplanes per month in 2016 and 14 per month by the end of the decade.

The Everett facility will continue to assemble seven airplanes per month, while Boeing South Carolina final assembly will gradually increase from three 787s per month today to five per month in 2016 and seven per month by the end of the decade.

The Boeing 787 Dreamliner family of airplanes offers airlines unmatched fuel efficiencies and environmental performance, while providing a new level of comfort for passengers through the thoughtful application of new technologies. To date, the 787 family has won more than 1,000 orders and more than 165 airplanes have been delivered to 21 customers worldwide.

The 787-10 will leverage 787 technology to provide more passenger and cargo capacity along with unparalleled seat-mile economics in the medium twin-aisle market. Since its launch in June 2013, the 787-10 has won 132 orders from six global customers.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 3, 2015

News Carter To China: US ‘Will Fly, Sail, Operate Wherever Law Allows’ Defense Secretary Ash Carter, in a speech billed as all about a new personnel approach for the Pentagon, laid out a clear line in the sand of the temporary islands the Chinese have been building. http://breakingdefense.com/2015/09/carter-to-china-us-will-fly-sail-operate-wherever-law-allows/ LRS-B details emerge: Major t...
 
 

News Briefs September 3, 2015

Soldier injured after parachute failed to deploy A soldier was injured during a U.S. Army Special Operations parachute training exercise in western Montana. Army officials at Fort Bragg, N.C., say 16 soldiers were conducting a free-fall parachute jump from two Blackhawk helicopters near Hamilton Aug. 31 when one soldier had an equipment malfunction and was...
 
 

Boeing, Jet2.com finalize order for 27 Next Generation 737-800s

Boeing and UK Leisure Airline Jet2.com have finalized an order for 27 Next Generation 737-800s, valued at approximately $2.6 billion at current list prices. Jet2.com currently operates an all-Boeing fleet of nearly 60 aircraft; however, this is the organization’s first direct Boeing order.† The aircraft will be used to take the company’s package holiday and...
 

 
boeing-emirates

Boeing, Emirates celebrate airline’s 150th 777 delivery

Boeing and Emirates Airline Sept. 3 celebrated the simultaneous delivery of three 777s — two 777-300ERs and one 777 Freighter — marking the entry of the 150th 777 into Emirates’ fleet. The delivery marks the first tim...
 
 

U.S. Air Force selects Chromalloy for F108 gas turbine engine module repairs

Chromalloy announced Sept. 2 that it has been selected by the U.S. Air Force to provide repairs on low pressure turbine modules for the F108 aircraft engine fleet, in a contract valued at up to $74 million. The one-year agreement was contracted by the Tinker Air Force Base in Oklahoma and includes four one-year options...
 
 
raytheon-colorado

Raytheon expanding in Colorado Springs

Raytheon will speed up growth of its Colorado Springs presence after signing a $700 million multi-year indefinite-delivery/indefinite-quantity contract to support operations at NORAD’s Cheyenne Mountain Complex. Under the...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>