Defense

August 15, 2014

Fleet Readiness Center East repairs Harrier using 3-D printing

Patternmaker Caleb Guelich, left, and engineer Justin Reynolds, both of Fleet Readiness Center East, inspect polymer form blocks made through fused deposition modeling, a type of additive manufacturing, also commonly referred to as 3-D printing. The form blocks, made in a matter of hours overnight on June 26 through mid-day June 27, were used to create repair parts for an AV-8B Harrier damaged during a hard landing on the USS Bataan (LHD 5) May 28. Using conventional methods, creating these tools could have taken two to three weeks.

Capt. William Mahoney had no idea that his successful hard landing of an AV-8B Harrier, whose nose gear failed to deploy, on the deck of the USS Bataan (LHD 5) on May 28 would go viral, making him and the event a social media sensation.

While what happened to the aircraft next may not reach the same level of social media success as the video of the pilot from Marine Medium Tiltrotor Squadron (Reinforced), 22nd Marine Expeditionary Unit, it has shined a spotlight on how technicians aboard the Bataan and artisans at Fleet Readiness Center East located at Marine Corps Air Station Cherry Point, N.C., are using high-tech resources like 3-D printing to repair aircraft and quickly return them to the fleet.

Developed in the 1980s, NAVAIR has used Additive Manufacturing technology – also known as 3-D printing – to create tools and other products at FRCs for the past several years. AM is a process that creates three-dimensional objects of almost any shape using computer technology to sequentially deposit thin layers of liquid or powdered metals, polymers or other materials on a substrate.

“AM is a revolutionary technology,” said Liz McMichael, NAVAIR’s additive manufacturing integrated product team lead.  “It has the potential to radically change how the Department of Defense, Department of the Navy, our partners and allies develop, produce and support their platforms and systems.”

Doug Greenwood, a FRCE aerospace engineer who, along with maintainers onboard the Bataan, dismantled the nose cone of the Harrier to determine the extent of damage.

“The hard landing damaged a portion of one of the structural frames in the nose cone,” Greenwood said.  After assessing the damage and working with the on-board fleet support team, technicians came up with a strategy to repair the aircraft.

Because only one portion of the aircraft’s frame was damaged, the team decided to cut out the damaged section and replace it with a matching section cut from a spare frame at FRCE.

“Sheet metal reinforcements, called ‘doublers’ would be needed to mate the donor section with the undamaged portion of the frame, which remained in the aircraft,” Greenwood said. “The challenge for FRCE was to manufacture the reinforcement doublers and get them to the ship for the repair.”

Sheet metal forming tools and flat patterns were designed on June 25 using the Original Equipment Manufacturer CAD model information. Within 48 hours of receipt of the OEM CAD model, tool design was complete and 3-D printing of the forming tools began.

“The tools were built using a polycarbonate material chosen because it has a high compressive strength that can withstand high-pressure presses up to 4,000 pounds per square inch (psi),” Greenwood said.

One forming tool took five hours to build, while the second set took about 30 hours.

“Using traditional, nondigital tool design and building processes, manufacture of the doublers would likely have taken two to three weeks,” Greenwood said. “Using the 3-D digital data and AM, time and cost were reduced significantly.”

After the AM forming tools were complete, the flat patterns were formed, using the tools, into the doubler parts on June 28. Fit-up and quality checks took place concurrently with the forming process. After forming, the parts were heat-treated and painted.

“On July 2, one week after receipt of the solid model of the frame, both sets were on their way to the Bataan to repair the damaged aircraft,” Greenwood said.

AM is being used at multiple Fleet Readiness Centers and NAVAIR locations.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 7, 2015

News: F-35 loses dogfight to fighter jet from 1980s – A new report alleges that an F-35A was defeated by the very aircraft it is meant to replace.   Business: South Korea selects Airbus for $1.33 billion tanker contract – European aerospace giant Airbus won a $1.33 billion deal June 30 to supply air refueling...
 
 
U.S. Chamber of Commerce photograph

Boeing, Embraer to collaborate on ecoDemonstrator technology tests

U.S. Chamber of Commerce photograph Frederico Curado, president & CEO of Embraer, and Marc Allen, president of Boeing International, at the Brazil-U.S. Business Summit in Washington, D.C. The event occurred during an offici...
 
 
Untitled-2

Tactical reconnaissance vehicle project eyes hoverbike for defense

The U.S. Army Research Laboratory, or ARL, has been exploring the tactical reconnaissance vehicle, or TRV, concept for nearly nine months and is evaluating the hoverbike technology as a way to get Soldiers away from ground thre...
 

 
Air Force photograph by SSgt. William Banton

Upgraded AWACS platform tested at Northern Edge

Air Force photograph by SSgt. William Banton Maintenance crew members prepare an E-3G Sentry (AWACS) for takeoff during exercise Northern Edge June 25, 2015. Roughly 6,000 airmen, soldiers, sailors, Marines and Coast Guardsmen ...
 
 
LM-Legion

Lockheed Martin’s Legion Pod™ takes to skies

Lockheed Martin photograph by Randy Crites Lockheed Martin’s Legion Pod recently completed its first flight test, successfully tracking multiple airborne targets while flying on an F-16 in Fort Worth, Texas. Legion Pod was in...
 
 
Air Force photograph by SSgt. Marleah Robertson

First Marine graduates Air Force’s F-35 intelligence course

Air Force photograph by SSgt. Marleah Robertson Marine Corps 1st Lt. Samuel Winsted, an F-35B Lightning II intelligence officer, provides a mock intelligence briefing to two instructors during the F-35 Intelligence Formal Train...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>