Local

August 2, 2013

Fort Irwin breaks ground for new water treatment plant

An artist’s rendering of the new water treatment plant.

 
A June 28 ground-breaking ceremony marked the beginning of a construction project that will replace Fort Irwin’s two-system water distribution pipelines with a single water system to supply potable water to all homes, offices and facilities throughout the Fort Irwin cantonment area.

A new water purification plant, using the latest technologies in water purification and recovery processing, is being built by CDM Smith over the next 12-18 months on the northwest end of Goldstone Road, past the housing area. The construction project, overseen by the Army Corps of Engineers Los Angeles District, will have a 6-million gallons daily capacity.

The plant will remove all contaminants found in Fort Irwin’s groundwater, including naturally occurring arsenic, fluoride, nitrate and dissolved solids. The new system will eliminate the need for water faucets now designated “DU” for domestic use (washing, cleaning, irrigation), while other faucets are designated “RO” (reverse osmosis) to provide water from which fluorides and arsenic are removed to meet drinking water standards.

In his remarks at the ground-breaking ceremony, then garrison commander Col. Kurt Pinkerton noted, “We have a 30-40 year life span of water capability [at Fort Irwin]…this further extends our sustainability of this post.”

In an interview after the groundbreaking ceremony, CDM Smith executive vice president Peter Tunnicliffe said, “This will be among the highest level of treatment of potable water systems of this kind.”

The new water purification plant would save water. Tunnicliffe noted that in a conventional reverse osmosis plant, for every gallon going through its process, “you get back only half a gallon.”

Construction project partners representing Fort Irwin, Army Corps of Engineers Los Angeles District and CDM Smith dig into the sand at the construction site for a new water treatment plant at Fort Irwin, June 28.

“That’s the level of commitment the government has made to this precious water source here on base,” Tunnicliffe said.

Water taken from Fort Irwin wells will be treated in a serial process, including electro dialysis reversal, lime softening, membrane filtration, reverse osmosis and mechanical evaporation (distillation). The purification process will yield 99 percent or more potable water from the water taken into the plant. The remaining water will discharge into a nine-pond system, where the remaining water will evaporate, leaving waste solids to be removed for appropriate disposal.

 




All of this week's top headlines to your email every Friday.


 
 

 
Gustavo Bahena

Flying Tigers activated

Gustavo Bahena The 2916th Aviation Battalion commander, Lt. Col. William Garber (right), hands a guidon to Capt. Jesse DeJaynes during a unit activation ceremony here, Oct. 16. DeJaynes leads the newly activated unit – B ...
 
 

Celebrating pride, spirit

From the Aleutian Islands to the Florida everglades, American Indians and Alaska Natives have contributed immensely to our country’s heritage. They have enhanced our nation through contributions in the fields of art, science, education, business and our military. Native Americans have bravely served and participated with distinction in U.S. military actions for more than 200...
 
 

Honoring cultural differences

National Hispanic Heritage Month, a celebration of the contributions and accomplishments of America’s Hispanic community, is celebrated from Sept. 15 to Oct. 15. In recognition of this year’s celebration, Weed Army Community Hospital and the National Training Center’s EO/EEO Office hosted “Hispanics, A Legacy of History, A Present of Action and a Future of Success,”...
 

 

Soldier, leader, Veteran

The Veterans Day observance provides the country an opportunity to recognize the contributions of past and current servicemembers, but it also gives Soldiers a chance to reflect on experiences and people who have impacted a career in defense of the United States of America. Deployment experiences, friends and family have been a huge influence in...
 
 

Sustainability involves repairs, latest technology, planning for future

The Directorate of Public Works here strives to keep this post, not only operational, but modern for personnel to conduct the mission of the National Training Center. In the past two fiscal years, DPW has been involved with numerous projects that continue the sustainability and upgrading of the installation, said DPW Director Mohammed Bari. Installation...
 
 
Photo courtesy of Lelan Daines

Ten-Miler team places fourth in division

Photo courtesy of Lelan Daines Fort Irwin Soldiers took fourth in their division at the 30th Army Ten-Miler road-race near Washington D.C., Oct. 11. A team of eight Soldiers placed fourth in a mix (male and female) division whi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


Directory powered by Business Directory Plugin