Local

August 2, 2013

Fort Irwin breaks ground for new water treatment plant

An artist’s rendering of the new water treatment plant.

 
A June 28 ground-breaking ceremony marked the beginning of a construction project that will replace Fort Irwin’s two-system water distribution pipelines with a single water system to supply potable water to all homes, offices and facilities throughout the Fort Irwin cantonment area.

A new water purification plant, using the latest technologies in water purification and recovery processing, is being built by CDM Smith over the next 12-18 months on the northwest end of Goldstone Road, past the housing area. The construction project, overseen by the Army Corps of Engineers Los Angeles District, will have a 6-million gallons daily capacity.

The plant will remove all contaminants found in Fort Irwin’s groundwater, including naturally occurring arsenic, fluoride, nitrate and dissolved solids. The new system will eliminate the need for water faucets now designated “DU” for domestic use (washing, cleaning, irrigation), while other faucets are designated “RO” (reverse osmosis) to provide water from which fluorides and arsenic are removed to meet drinking water standards.

In his remarks at the ground-breaking ceremony, then garrison commander Col. Kurt Pinkerton noted, “We have a 30-40 year life span of water capability [at Fort Irwin]…this further extends our sustainability of this post.”

In an interview after the groundbreaking ceremony, CDM Smith executive vice president Peter Tunnicliffe said, “This will be among the highest level of treatment of potable water systems of this kind.”

The new water purification plant would save water. Tunnicliffe noted that in a conventional reverse osmosis plant, for every gallon going through its process, “you get back only half a gallon.”

Construction project partners representing Fort Irwin, Army Corps of Engineers Los Angeles District and CDM Smith dig into the sand at the construction site for a new water treatment plant at Fort Irwin, June 28.

“That’s the level of commitment the government has made to this precious water source here on base,” Tunnicliffe said.

Water taken from Fort Irwin wells will be treated in a serial process, including electro dialysis reversal, lime softening, membrane filtration, reverse osmosis and mechanical evaporation (distillation). The purification process will yield 99 percent or more potable water from the water taken into the plant. The remaining water will discharge into a nine-pond system, where the remaining water will evaporate, leaving waste solids to be removed for appropriate disposal.

 




All of this week's top headlines to your email every Friday.


 
 

 

Legal counsel helps Soldiers with Integrated Disability Evaluation System

Soldiers undergoing a medical evaluation board sometimes feel lost and confused with the significant decisions they have to make that will affect their military careers and the rest of their lives. The Office of Soldiers’ Counsel is the Army’s team of qualified and trained attorneys and paralegals who assist Soldiers in the Integrated Disability Evaluation...
 
 
JAG_seal

The power to contract – use it wisely

The basic memorialization or record of any business transaction is a contract. More often than not, this contract is the only evidence of any relationship between the parties to the transaction. Whether you are purchasing somet...
 
 
Convoy_brief

NTC trainers prepare units for success on battle fields of today, tomorrow

Staff Sgt. Marcus McCormick, of the 289th Quartermaster Company, provides a convoy its mission brief Aug. 20 during a morning supply mission.   The training that rotational units receive here can be brutal – challenging ...
 

 
Gustavo Bahena

Department of Defense official views training area

Gustavo Bahena National Training Center and Fort Irwin Commander Maj. Gen. Ted Martin motions while speaking with Jamie Morin, director of Cost Assessment and Program Evaluation for the Department of Defense. The director of Co...
 
 
Photo by Capt. Jessica Cook

Women combat isolation with mentorship

Photo by Capt. Jessica Cook Sgt. Meriem Ettioutioui (right), 51st Translator and Interpreter Company, talks with Spc. Farida Alvi and Spc. Maryam Mahfeli, also with 51st TICO, about her deployment experience in 2013. The tough ...
 
 
Gustavo Bahena

IMCOM command sergeant major visits Fort Irwin

Gustavo Bahena Fort Irwin USAG Commander Col. Jon Braga points to an illustration of the installation’s future new hospital while speaking with Command Sgt. Maj. Jeffrey Hartless, of United States Army Installation Management...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


Directory powered by Business Directory Plugin