Defense

May 27, 2016
 

CH-53K completes first 20K lift

Sikorsky photograph

navair-helo
The U.S. Marine Corps’ newest helicopter, the CH-53K, completed its first external load flight test carrying a 20,000 lb. load May 26 at Sikorsky Aircraft Corporation’s Development Flight Center in West Palm Beach, Fla. Envelope expansion tests will continue with incrementally increasing speeds with the 20,000 load, and then on to the CH-53K’s requirement, a 27,000-pound external payload.




All of this week's top headlines to your email every Friday.


 
 

 
af-trainer

T-X to replace T-38 at pilot training bases

The Air Force announced Feb. 21 that the Advanced Pilot Trainer (T-X) will replace T-38C Talon aircraft at existing undergraduate pilot training bases, with Joint Base San Antonio-Randolph, Texas, named as the preferred locatio...
 
 
army-modernization

Vice chief testifies how Army is addressing threats through modernization, other capabilities

The last time a Soldier was killed by enemy aircraft on the battlefield was in 1953, during the Korean War, said Vice Chief of Staff of the Army Gen. James C. McConville. Now, the Army is preparing in earnest for that type of p...
 
 

Around the Air Force: Feb. 21

On this look around the Air Force the 2019 budget request seeks to restore readiness, lethality and modernize, and security forces Airmen rescue a lost 2-year-old in Africa.